Friday, May 29, 2009
Uranium and Used Mining Equipment for Sale
This happened while the demand for used mining equipment for sale rose by 15 points from the past month due to various mining operations in Africa, Western Asia, South America are strengthening. For used mining equipment for sale, contact MSloane Consulting.
In Johannesburg, South Africa, where the company's stock is more thinly traded, shares fell 4,86% for the day, to R17,60 each, after falling as low as R15,00 earlier in the day.
After arresting the head of State, Kazakhstan's National Security Committee said that it was investigating deals made by the disgraced CEO, who had “illegally” sold stakes in uranium assets. The KNB said that the sale of 30% in the Kyzylkum joint venture, which owns the Kharasan mine, was one of the transactions being investigated.
Thursday, May 28, 2009
Construction Equipment and the M25 Highway in London
For construction equipment for sale for any road project, visit MSloane Consulting.
Speaking to the media after closing the deal last week, winning consortium Connect Plus chief executive Tim Jones said: “We started work last night. We have been on clearing the verges and removing white lines and chevrons.” Jones added that more significant work would begin today with the start of verge excavation and contraflows introduced.
Connect Plus comprises Balfour Beatty, Skanska, Atkins and Egis Projects. The M25 concession will run for 30 years and involves widening the motorway at key points from three to four carriageways in each direction. In addition, the existing road will be resurfaced and central reservations and lighting will be replaced.
Wednesday, May 27, 2009
Timberline Resources and Heavy Equipment for Sale
Heavy equipment for sale for exploration and drilling are available at MSloane Consulting.
Timberline Resources is an operations-based mineral cumpnee–focused mostly on the nitty-gritty aspects of exploration and drilling as opposed to processing or distribution.
Their project near Butte began quietly back in 2007, when they did some initial drilling, and began eyeballing a 150-acre parcel of adjacent property to buy. They also began pitching industry partners and contractors to help facilitate the operation. By the time 2009 rolled around, they’d discovered high-grade gold, gotten a 50/50 partnership with Boise-based Small Mine Development, and were set to submit exploration filings with Montana’s Department of Environmental Quality (DEQ).
Tuesday, May 26, 2009
Construction Equipment - MSloane Consulting: Ausenco and Newcrest Mining
MSloane Consulting assists in the marketing, evaluation and procurement of construction equipment.
Monday, May 25, 2009
Sabodala Gold Mine and Mining Equipment
For mining equipment for sale, contact MSloane Consulting.
The $220m project is set to process material above the nominal mill capacity of two million tons per annum. The project is expected to produce 160,000oz of gold in 2009 at a cash operating cost between $420 and $440 an ounce.
The Senegal Government has a 10% stake in Sabodala Gold Operations, which operates the mine.
Friday, May 22, 2009
Low Cost Used Mining Equipment for Sale and Rio Tinto Cuts 33% of its Iron Ore Prices
For low cost used mining equipment for sale, go to MSloane Consulting.
Assuming rival BHP Billiton concludes a similar deal with Japanese and South Korean mills, as is the usual practice, the pressure will shift to Chinese steelmakers such as Baosteel that have fiercely resisted anything less than a 40% to 50% reduction in prices to 2007 levels.
The long overdue settlement for contracts beginning from April will bring some certainty to both miners and mills, which have been in deadlocked talks as demand for both steel and its main raw material collapses in the wake of a global recession.
Wednesday, May 20, 2009
Turbinomic and Heavy Equipment for Sale
For heavy equipment for sale, go to MSloane Consulting.
Tuesday, May 19, 2009
Mining and Corporate Social Responsibility in Africa
One of the key services offered by corporate social responsibility (CSR) initiatives is health programmes, which are becoming more commonplace across Africa. In particular, large mining companies are offering programmes to help those suffering from HIV/AIDS, Malaria and TB; diseases which pose the biggest threat to mine workers and their families.
As the global spread of swine flu demonstrates, ensuring disease control methods are in place is crucial for maintaining healthy communities. Mining companies have long since recognised that protecting the health of their workers not only increases productivity but also ensures the longevity of mining projects, particularly at operations with long lifecycles, such as diamond mines. Diamond specialist De Beers is a case in point. In recent years the company has invested in a HIV and AIDS management programme to raise awareness and provide treatment for its workers. It has also pioneered free antiretroviral treatments.
By the end of 2008, around 70% - 2% more than the previous year - of De Beers employees had participated in HIV testing at the company’s South African operations, while around 80% of permanent employees at the Voorspoed mine had participated in screening within the first six months of the mine opening, according to statistics published in its 2008 Report to Society.
Monday, May 18, 2009
Construction Equipment to Roll Out to Reno
Friday, May 15, 2009
Mining Equipment for Sale
For used mining equipment for sale, visit MSloane Consulting.
It is widely used in a variety of metals and non-metallic minerals, cement, refractories, abrasives, glass raw materials, construction aggregate, sand, metallurgical and other industries. It is applicable to medium and fine crushing of various ores and rocks such as iron ore, non-ferrous metal ore, corundum, bauxite, quartz sand, corundum, perlite and basalt materials.
Thursday, May 14, 2009
For Sale: Spierings Crane and Foremost Reverse Circulation Rig
Used Mining and Construction Equipment
SPIERINGS SK599-AT5 HYDRAULIC FOLDING CRANE
- 6528 hours in the top cab (crane)
- 3661 hours in the chassis with 107794 KM
- REG. NO. PF04SNK C/NO. XL9AT500240251002
- DOR 1.6.04 S/NO. 599002
FOREMOST MPD1500 TRACKED TILTABLE PLATFORM REVERSE CIRCULATION RIG
- With 90,000 lb pullback
- 10,000 hrs but has completely overhauled in 2006 and has been in dry storage since.
- Comes with a very comprehensive spares package including many engine, compressor, new drill bits and 2 new hammers etc.
- Top head was over hauled and all new seals ready to go to work.
- Comes with very good condition low loader with removable goose neck, also with spares, wheel tyres, hydraulic pipes, etc.
- Also included is 900 ft of double walled drill pipe.
Used Construction Equipment and 27-Storey Green Building in Sydney
For used construction equipment, go to MSloane Consulting
Located at 1 Bligh Street in the Aussie capital, the building is a sleek elliptical structure that will feature uninterrupted views of Sydney's famous harbour from a rooftop garden.
Wednesday, May 13, 2009
Forrestania Nickel Project and Heavy Equipment for Sale
For heavy equipment for sale for this project, go to MSloane Consulting
Two additional planned underground mines - Cosmic Boy and Diggers South - are wholly owned by Forrestania Nickel Project. The company expects to upgrade the nickel concentrator in two stages to achieve a target of 750,000 tonnes per annum (tpa) ore. The first stage is fully commissioned with an ore capacity of 300,000tpa. The second stage is scheduled for March 2010 to treat ore from the Spotted Quoll mine. The major infrastructure such as grid power, roads, water, tailings disposal and airstrip is set for completion during the second stage.
Western Areas’ objective is to increase the capacity of high-quality mineral resources at Forrestania to 40,000t nickel in 2009. The Flying Fox mine initiated production in 2008 and produced 200,597t at 4.05%, containing 8,118t of nickel in concentrate.
Tuesday, May 12, 2009
Construction Equipment for Bangkok's Met Tower
Bangkok's newest residential tower, the Met, have specific ventilation levels for its residents. The 228m tower, which has almost completed construction, is made up of three slender vertical columns connected together by eight skybridges with communal gardens. WOHA Limited + Tandem Architects say this will give occupants a break from the city's notoriously smoggy atmosphere.
Monday, May 11, 2009
White Dam Gold Project and Mining Equipment
Friday, May 8, 2009
Used Mining Equipment for Sale: Chile Coal Mine
Used Mining Equipment for Sale for this project, contact MSloane Consulting.
Three proven sub-bituminous coal deposits and will involve the development of mines and the construction of a mechanised sea port to ship the coal. The port is being constructed at a cost of $50m and will be able to accommodate colliers up to 140,000t with 43 ship calls per year.
Thursday, May 7, 2009
Used Mining Equipment for Sale: Perron Gold Project
For used mining equipment for sale, contact MSloane Consulting.
Following a recent resource evaluation on the gold Zone called "Zone 3" estimated to be of 69,907 ounces of gold at 1.86 g/t Au in the inferred category (Press release dated April 21, 2009), a six-hole 1,500 meter drill program is planned to test near-surface, lateral and depth extensions of this underexplored gold Zone.
Wednesday, May 6, 2009
Heavy Equipment for Sale: Peak HIll Gold Mine in Sydney
In 2007, Alkane discovered the Caloma deposit about 14km north of the Peak Hill Gold Mine below its Silurian sediments.
Heavy Equipment for Sale for this project, contact MSloane Consulting.
The site is in its third phase of major production having begun operations in the late 19th century before falling into a prolonged period of minor production. This mine was re-activated by Alkane Resources between 1996 and 2006, and in 2007 additional resources were discovered 24km north of the original site.
Monday, May 4, 2009
Mining Equipment for Sale, Power Plants and Pumps
For mining equipment, power plants to power your pumps, contact MSloane Consulting.
Some companies, when faced with a limited capacity of pump technology and/or products, often make the pump "fit" the client's needs without ensuring the product is the best solution for the application.
In addition, clients are looking to buy down in the present economic situation, but often overlook the additional costs of energy consumption, loss of production due to downtime and maintenance. Life-cycle costing is extremely important to retain current as well as long-term profitability.