Friday, February 26, 2010

Used Mining Equipment for Sale: 2005/2006 Moxy MT41 Articulated Dump Trucks for Sale

Used Mining Equipment for Sale

- Price: $137,000 USD ea ex-works or best offer plus 6% Buyers fee. Plus GST charges for Australian Buyers
- Hours: 3,507 to 4,536
- Weight: 14 Tons
- Location: Australia

Features:

- Air Conditioner
- Bed, Standard
- Auto Lube
- Retarder
- Tailgate

Contact us for more information.

Thursday, February 25, 2010

Used Construction Equipment: Meridian Systems' Proliance Software to be Used in Construction Management by Weston Solutions

Used Construction Equipment: Meridian Systems, the Plan-Build-Operate technology solutions leader for project-based organizations, announced in a press release, that Weston Solutions, Inc. (WESTON(R)) has selected Proliance(R) software to standardize its construction management processes.

With more than 60 offices around the globe, WESTON, ranked 35 on the ENR top 200 environmental firms and 65 on the ENR top 500 design firms, is a global leader in environmental solutions, sustainable development, design/build construction, green buildings, and clean energy.

Wednesday, February 24, 2010

Heavy Equipment for Sale: Sulzer, Wartsila and Pielstick Diesel Engines with Generators for Sale

Heavy Equipment for Sale: Sulzer, Wartsila and Pielstick Diesel Engines with Generators for Sale in the Philippines


225MW Power Plant with 21 Sulzer 16ZAV40S HFO Diesel Engines

- Units: Sulzer 16ZAV40S Engine x 21
- Call for price (negotiable)
- Hours: 40,000 approx
- Location: Luzon, Philippines
- Fuel: Diesel Bunker "C" Fuel
- With original spare parts

The plant, with an initial contracted capacity of 215 MW which was increased to 225 MW beginning January 1997, generates power using twenty-one (21) Sulzer ZAV40S diesel engines with Alstom Generators operating synchronously. The diesel engines were manufactured and supplied by New Sulzer Diesel of France.

With ISO 14001:2004 Certification from Certification International.

This plant is for immediate sale.

90MW Power Plant with 5 Pielstick 18PC4 HFO Diesel Engines

- Units: 18MW Pielstick 18PC4 Engine x 5
- Price: $708, 000 each (as is, without overhaul or Hz conversion)
- FOB Plant
- Location: Philippines

Units need to be overhauled as they have been idle. Cost for overhaul: Minimum $86,950 USD to maximum of $260,898 (per engine depending on condition of engines when taken down).

Cost for overhauled engines turned back to zero hours, 60Hz: Minimum $794,956 USD to maximum $968,898 USD per engine.

Can be converted to 50Hz but will reduce power output by 17%-20%. Cost for overhauled engines turned back to zero hours with 50Hz conversion is minimum $849,956 USD to maximum $1,023,898 USD per engine.

We can provide overhauling done by ISO certified companies. We can also help in transport quote and recommissioning of plant.


3.3MW Power Plant with Wartsila Vasa 9R32 HFO Diesel Engine and Auxiliaries with Complete Manuals and Special Tools

- Price: $426, 000 USD or best offer
- FOB site
- Location: Philippines

The engine was manufactured in 1989 and all preventive maintenance for the engines and auxiliaries were all done by Wartsila Philippines. The engine is very well maintained and parts are all original Wartsila and recently underwent 80,000H PMS, wherein the engine had been practically placed to ZERO HOUR. This is one of the best small plants operated in the Philippines considering that it was previously owned by Unilever, a multinational company.

Please feel free to contact us for your inquiries. Thank you.


Tuesday, February 23, 2010

Construction Equipment: Deere Reports 19% Rise in Earnings for Farm Equipment as Construction Units Remain Sluggish

Construction Equipment: Deere & Co. (DE) increased its yearly profit forecast as it reaped a 19% increase in fiscal Q1 earnings. The world's largest maker of farm equipment by revenue cited an expected recovery in North American business alongside a turnaround in its loss-making construction unit.

Monday, February 22, 2010

Mining Equipment: Major South African Gold Mining company Harmonyto Produce 100,000 Oz over the Next 12 Months

Mining Equipment: Major South African gold mining company Harmony sees the Free State assets it bought from Pamodzi Gold to produce around 100 000 oz over the next 12 months with its purchased mining equipment. Harmony said that it is expecting production from the Steyn 1, Steyn 2 and Lorraine 3 shafts to 150 000 oz in the second 12-month period. During the past few months, Harmony conducted preproduction work at the Pamodzi shafts to make the operations safe and return them to production.

Friday, February 19, 2010

Used Mining Equipment for Sale: Alix Resources to Mine Rare Earth Oxides

Used Mining Equipment for Sale: Alix Resources plans to eventually mine a site for Rare Earth Oxides by acquiring a block of land of approximately 450 hectares in British Columbia which hosts a historic BC Minfile 2.04% Rare Earth Oxide (REO) manifestation at random across a 15 metre section.

MSloane Consulting provides used mining equipment for sale to mining projects worldwide.


Thursday, February 18, 2010

Used Construction Equipment: Federal Stimulus Stimulates Construction

Used Construction Equipment: Stimulus funds from the US Federal Government have saved or created more construction jobs, helped sold new and used construction equipment than previously thought, according to the Associated General Contractors of America.

Ken Simonson, chief economist of AGC said that Obama's stimulus package is one of the very few life savers that the construction industry experienced last year and is one of the few hopes to keep it going in 2010.

See one of our used construction equipment for sale.





Wednesday, February 17, 2010

Heavy Equipment for Sale: 225MW, 90MW and 3.3MW HFO Power Plants for Sale in the Philippines

Heavy Equipment for Sale: Diesel Engines - 225MW, 90MW and 3.3MW HFO Power Plants for Liquidation in the Philippines.

225MW Power Plant with 21 Sulzer 16ZAV40S HFO Engines

- Call for price (negotiable)
- Hours: 40,000 approx
- Location: Luzon, Philippines
- Fuel: Diesel Bunker "C" Fuel
- With original spare parts


90MW HFO Power Plant with Five (5) 18PC4 Pielstick Engines

- Units: 18MW 18PC4 Pielstick Engines x 5
- Price: $708, 000 each (without overhaul or Hz conversion)
- FOB Plant
- Location: Philippines



3.3MW Wartsila Vasa 9R32 HFO Engine and Auxiliaries with Complete Manuals and Special Tools

- Price: $426, 000 USD or best offer
- FOB site
- Location: Philippines



Contact us for inquiries.

Thank you.






Tuesday, February 16, 2010

Construction Equipment: Construction in Wales performed better than the rest of the UK

Construction Equipment: Construction in Wales performed better than the rest of the UK in the final quarter of 2009, according to latest research.

The data, compiled by the Royal Institution of Chartered Surveyors, found the sector in Wales did better than every other UK region and nation.

Rics’ survey found that all other regions reported a decrease in workloads in Q4, with 12% more chartered surveyors reporting a decline compared to a rise.

However, Wales saw 20% more chartered surveyors reporting a rise in workload compared to a fall.

Looking forward, overall expectations for workloads, employment and profits for the next 12 months are all fairly downbeat.

Workload expectations for future activity deteriorate with an equal number of surveyors expecting a rise or a fall – this compares drastically to Q3 when 50% of chartered surveyors anticipated an increase than a decrease in workloads.

Monday, February 15, 2010

Mining Equipment / Power Generation Equipment: 225MW, 90MW and 3.3MW HFO Power Plants for Liquidation in the Philippines

225MW Power Plant with 21 Sulzer 16ZAV40S HFO Engines

- Call for price (negotiable)
- Hours: 40,000 approx
- Location: Luzon, Philippines
- Fuel: Diesel Bunker "C" Fuel
- With original spare parts


90MW HFO Power Plant with Five (5) 18PC4 Pielstick Engines

- Units: 18MW 18PC4 Pielstick Engines x 5
- Price: $708, 000 each (without overhaul or Hz conversion)
- FOB Plant
- Location: Philippines



3.3MW Wartsila Vasa 9R32 HFO Engine and Auxiliaries with Complete Manuals and Special Tools

- Price: $426, 000 USD or best offer
- FOB site
- Location: Philippines



Contact us for inquiries.

Thank you.

Friday, February 12, 2010

Used Mining Equipment for Sale: Mindoro Resources Targets 50 to 70 Million Dry Metric Tonnes of Nickel and Iron Ore

Used Mining Equipment for Sale: Mindoro Resources targets 50 to 70 million dry metric tonnes (DMT) in a grade range of 0.9% to 1.2% nickel and 28% to 32% iron from its limonite and saprolite exploration in northern Surigao.

This is in addition to Mindoro's Agata North Project, which has an indicated and measured resource of 26.92 million DMT at 1.11% nickel and 0.06% cobalt, containing 657 million pounds of nickel and 24 million pounds of cobalt, and an additional 3.79 million DMT in the inferred category, containing 89 million pounds of nickel and 2 million pounds of cobalt.

The Surigao projects are in an important nickel producing district. The Agata North project contains major strategic nickel laterite resources with strong competitive advantages, including excellent infrastructure, close proximity to the ocean and markets, abundant limestone on site and potential for establishment of a world-class nickel and cobalt processing operation.

Thursday, February 11, 2010

Used Construction Equipment: Construction for London 2012 Olympics on Schedule

Used Construction Equipment: The construction of infrastructure and sports venues for the London 2012 Olympic and Paralympic Games remains on time and within budget, says the Government. In an update on preparations for the event, the Department for Culture, Media and Sport said that the anticipated final cost of the project has risen by £21 million (0.3 per cent) to £7.262 billion since the publication of the last report.

Wednesday, February 10, 2010

Heavy Equipment for Sale: Formation Metals will Develop, Operate and Reclaim the Idaho Cobalt Mine

Heavy Equipment for Sale: Canada-based Formation Metals will develop, operate and reclaim the Idaho cobalt mine, an undeveloped site situated in east-central Idaho, US. The mine will be developed into an 800t/d operation. Construction will begin in the first quarter of 2010.

The mine will begin production in early 2011. When operational, the mine will annually produce 1,525t of high purity and super-alloy-grade cobalt. Production will equal 3.3% of global cobalt supply.

Tuesday, February 9, 2010

Power Generation Equipment - for Sale: 3.3 MW Wartsila Vasa 9R32 Engine and Auxiliaries with Complete Manuals and Special Tools

3.3 MW Wartsila Vasa 9R32 Engine and Auxiliaries with Complete Manuals and Special Tools

Price: Call us
Location: Philippines

The engine was manufactured in 1989 and all preventive maintenance for the engines and auxiliaries were all done by Wartsila Philippines. The engine is very well maintained and parts are all original Wartsila and recently underwent 80,000H PMS, wherein the engine had been practically placed to ZERO HOUR. This is one of the best small plants operated in the Philippines considering that it was previously owned by Unilever, a multinational company.

Below is the specs of the engine and generator. This is a complete plant with ABB Brushless Synchronous 4000KVA 720 RPM alternator, ABB Stromberg Control Panel, Main Distribution panel with Siemens instrumentation, 3 Wesfalia separators type 5-02-066/4 and 20-02-066/4, water softening system, compressed air system, 3 units of 7 MT Day tanks and water cooling system, complete manuals and set of special tools.

Monday, February 8, 2010

Mining Equipment: Nebu Resources Inc. Continues Drilling on its Denton Township Projects

Mining Equipment: Nebu Resources Inc. continues drilling on its Denton Township projects adjacent to properties held by Lakeshore Gold Mines Inc., approximately 30 kilometers southwest of Timmins, Ontario since they resumed in December 2009, in the area of high-grade gold mineralization reported in its November 30, 2009 press release, to continue evaluation of this area of gold mineralization.

The vein or veins appear to have been intersected in all of the recently completed drill holes with the highlights from recent assay data including the results from drill hole DE-09-26 that include core length intervals of 1.5 metres assaying 1.85 g/t and 2.6 metres averaging 3.03 g/t in the vein zone and a deeper intersection averaging 17.18 g/t over a core length of 3.2metres near the contact of the diorite intrusion.

While the latter intersection is deeper, it should be noted that this intersection is still less than 120 metres below surface, whereas much of Lakeshore Gold’s recent success has resulted from drilling holes to depths of more than 700 metres vertically.

Friday, February 5, 2010

Used Mining Equipment for Sale:

Used Mining Equipment for Sale: Nass Valley Gateway Ltd., is geared to explore gold prospect sites in Ontario, Canada as it announce the signing of an Acquisition Agreement with Golden Dawn Minerals Inc. (GOM), while MSloane Consulting provides used mining equipment for sale to mining companies anywhere in the world. This acquisition gives the Company an option to acquire an 80% Joint Venture interest in three gold prospects within the Larder Lake Mining Division of the Province of Ontario, Canada.

The three properties, Central Catharine, Link-Catharine, and the 80-Foot-Fall property are located within the Boston-Skead gold belt of northeastern Ontario. This crescent-shaped gold belt is 25 km south of the still productive Kirkland Lake gold belt that has yielded 24 million ounces of gold in the past century of mining. Gold mineralization in this belt occurs with quartz, quartz-sulphide veins and veinlets in Archean volcanic rocks that have been intruded by granitic batholiths.

For the Link-Catharine area lying centrally between the other two properties, the most recent exploration work within the package of properties was conducted in 2008 and 2009. Highlights include 3.55g/t gold over 3 m and 3.26 g/t gold over 1.2 m in hole DDH CAT 08-22, and 1.01g/t gold over 10 m and 2.65 g/t gold over 3.4 m in DDH CAT 08-04, and 17.5g/t gold over 1 m in DDH CAT 09-02. Together with values of 6.00g/t over 8.6 m and 1.91g/t gold over 20.4 m from hole 99-4, and encouraging gold values from numerous other holes within a broad target area, the results suggest an extensive zone of gold mineralization that warrants concerted continued evaluation for gold deposits.

Thursday, February 4, 2010

Used Construction Equipment: JCB and Volvo Join Forces for Skid Steer Loaders

Used Construction Equipment: In a press release, JCB and Volvo Construction Equipment (STO:VOLVA) (STO:VOLVB) said they have entered into a framework agreement under which they will cooperate on the engineering and manufacturing of skid steer loader and compact tracked loader products for distribution under their respective brands and through their respective global dealer networks.

It is envisaged that the first mono boom Volvo branded machines will be in production at JCB’s Savannah, Georgia facility by year end 2010. Volvo Construction Equipment will then transition skid steer loader models over time from its Pederneiras facility in Brazil.

Wednesday, February 3, 2010

Heavy Equipment for Sale: Philex Ships P805-M Worth of Metals in January

Heavy Equipment for Sale: Philex Mining Corporation reported that its Padcal mine delivered ore worth P805 million in January this year, an 8% improvement over the P745 million worth of ore mined in the same month of 2009.

In a disclosure to the Philippine Stock Exchange, Philex president Jose Ernesto Villaluna Jr. said Philex delivered 684,459 dry metric tons of ore resulting in 4,705 DMT of concentrates.

The concentrates contained 55.17 grams per DMT of gold, 24.96% copper and 57.09 grams per DMT of silver or about 8,354 ounces of gold, 2.59 million pounds of copper, and 8,636 ounces of silver.

In January last year, Philex produced 752,261 DMT of ore resulting in 6,122 DMT of copper concentrates averaging 61.6 grams per DMT of gold, 23.81% copper, and 60.03 grams per DMT of silver or about 12,134 ounces of gold, 3.21 million pounds of copper, and 11,817 ounces of silver.

Tuesday, February 2, 2010

Construction Equipment for the Hong Kong-Zhuhai-Macau Crossing

Construction Equipment: Plans for a 38km crossing between Hong Kong and Macau are moving ahead. MSloane Consulting provides The Hong Kong-Zhuhai-Macau crossing is a giant in the world of bridges and tunnels. It will be the first major marine bridge and tunnel project in China, stretching a mammouth 38km between Lantau island in the south west of Hong Kong across the mouth of the Pearl river delta to the island of Macau and Zhuhai on the Chinese mainland.

The project has been on the drawing board for some time after first being discussed by politicians in the 1980s. The Hong Kong-Zhuhai-Macau Bridge Advance Work Coordination Group was established in 2003 and the China’s Central Government and the regional governments of Guangdong, Hong Kong and Macau agreed finance last summer.

Monday, February 1, 2010

Mining Equipment: Voorspoed Mine Continues Diamond Production

Mining Equipment: The Voorspoed mine, owned by De Beers Consolidated, continues diamond production after its ramp-up activities began in July 2008 while MSloane Consulting continues to provide mining equipment to mining operations worldwide. It is located 30km north-east of Kroonstad, in the free-state province of South Africa. The tenure of the mine is 12-16 years, including activities such as pre-stripping, ramp-up production and closure.

The mine is expected to have a full capacity production of 800,000 carats per year. The company ramped up production levels from 60,000 carats in October 2008. Over ten million carats are expected to be generated during the life of the mine.