Tuesday, July 21, 2009

Construction Equipment: China State Construction Engineering Corp. Raises $7.3 Billion

Construction equipment: MSloane Consulting learned that China State Construction Engineering Corp. is China's largest housing contractor and will sell as many as 12 billion shares at 3.96 yuan to 4.18 yuan each. The sale of a 40 percent stake brings the value of State Construction at as much as 125.5 billion yuan.

China State Construction Engineering Corp. is raising 50.2 billion yuan ($7.3 billion) in the world’s biggest initial public offering since 2008.

State Construction’s IPO is almost 28 times larger than the second-biggest sale in mainland China this year, testing a rally that’s pushed the benchmark Shanghai Composite 80 percent higher since Dec. 31. The company, led by Chairman Sun Wenjie, plans to use proceeds to expand in residential construction, as a surge in bank lending drives a pickup in the housing market.

Monday, July 20, 2009

Mining Equipment and $16.6M Rough Diamonds Sold

With mining equipment, Trans Hex, South African diamond producer produced about $16,6-million by selling 17 075 ct at the group’s July tender sale, it reported. MSloane Consulting on the other hand helps mining companies increase output with efficient mining equipment.

Trans Hex achieved an average price of $973/ct, which the company said reflected the upward rise in rough diamond prices since March.

In total, 86 stones in excess of ten carats were sold with 13 stones in excess of 20 ct and two stones in excess of 50 ct in weight.

Friday, July 17, 2009

Used Mining Equipment for Sale: The Pujada Nickel Mine in Davao Oriental, Philippines

Used Mining Equipment for Sale: The Pujada nickel mine is an open pit deposit spread across 11,799ha and commercial production is expected to begin during 2009-10. MSloane Consulting provides used mining equipment for sale across the country and across the globe.

It is located in the municipalities of Mati, San Isidro and Governor Generoso in the province of Davao Oriental in the Philippines. The mine is owned by BHP Billiton in partnership with Queensland Nickel. The mine will create around 2,700 jobs.

Current tenement holders of the project include Hallmark Mining/Austral-Asia Link Mining. Mineral production sharing agreements to the project were assigned in the name of Hopewell Mining, St Patrick Mining and Development, Hallmark Mining, PL Goodman Mining and Development and Blue Ridge Mineral. Other tenement holders of the mine include Oregon Mining and Development, Galactica Mining and Development and Mount Peak Mining and Development.

Thursday, July 16, 2009

Used Construction Equipment: South Carolina Highway Upgrade

A dangerous stretch of South Carolina highway is now going to be upgraded with used construction equipment. MSloane Consulting provides used construction equipment that are more economical to purchase especially during this time of economic recession. Making the U.S. 17/ACE Basin Parkway highway safe for motorists, while giving residents and vacationers a faster way of escaping an approaching hurricane, is the goal of a $100 million road project near the state’s southernmost tip.

Eight miles (12.8 km) of the U.S. 17/ACE Basin Parkway, a stretch of the federal highway just north of Beaufort, is currently undergoing an expansion from a treacherous two-lane road to a median-divided four-lane highway (a smaller segment of the highway will even include a fifth lane).

Wednesday, July 15, 2009

Heavy Equipment for Sale: Drilling Campaign on San Miguel Project in Mexico

Heavy Equipment for Sale: Paramount Gold and Silver Corp. announce that the drilling campaign on the San Miguel project was restarted which would be good for heavy equipment for sale to be back in action. This drilling program will be conducted in 2 distinct stages, target testing and follow-up resource delineation. Exploration drilling is focusing on the gold-rich parts of the San Miguel mineral system with the goal of defining 2 million gold ounces within the next 12 months. It is anticipated that a significant silver credit would accompany successfully attaining this goal. The initial target testing stage is utilizing 1 diamond core drill contracted from Layne de Mexico S.A. de C.V.

Tuesday, July 14, 2009

Construction Equipment: Accelerated Bridge Project in Massachusets

Contractors, subcontractors and construction equipment providers around Massachusetts may hope for multiple state highway and bridge projects as the Governor’s Accelerated Bridge Project (ABP) is now coming through. MSloane Consulting provides used construction equipment that are more economical to purchase especially during this time of economic recession.

There will be work for companies of all sizes. There will be jobs of all sizes for construction contractors. "The jobs range from the $300 million Longfellow Bridge to much smaller bridge preservation jobs, ranging in the hundreds of thousands dollars,” said Mass Highway Commissioner Luisa Paiewonsky. They are expecting an array and many types of companies that will be bidding on the work.

A total of 30 projects are ready for construction or under way as part of Gov. Deval Patrick’s Accelerated Bridge Program to reduce the Commonwealth’s backlog of structurally deficient bridges

Monday, July 13, 2009

Mining Equipment for an Oil Prospect in Louisiana by U.S. Energy Corp.

Mining Equipment: U.S. Energy Corp., an exploration and mining company with molybdenum, oil and gas, geothermal projects projects, and real estate assets, announced that it has entered into a third Participation Agreement with Houston, Texas-based Houston Energy L.P. MSloane Consulting, on the other hand, provides mining and construction equipment for various mining and construction companies worldwide. Houston Energy L.P. will acquire a 25% working interest in an oil prospect located in southeast Louisiana. Houston Energy estimates the prospect has a potential reserve of 2.1 million barrels of oil.

Friday, July 10, 2009

Used Mining Equipment for Sale

Used mining equipment for sale targeted to Uranium One which has two operating mines in Kazakhstan. The Akdala mine, in which the company holds 70%, continues to produce in line with expectations, Uranium One said. The firm also holds 70% of the South Inkai mine, which declared commercial production on January this year and continues to ramp up output as planned.

By the end of the second quarter, 134 of the 343 wells scheduled to be installed this year at South Inkai had been installed, and the operation remains on track to commission the drying circuit by year end.

MSloane Consulting helps mining companies cut operational costs through the purchase of high-performing used mining equipment for sale.

The circuit will help Uranium One cut operational costs, because the company expects Akdala will be also able to use excess drying capacity at South Inkai, which will reduce the need to use third-party processing facilities for drying and calcining.

Thursday, July 9, 2009

EQUIPMENT WANTED: Dump Trucks, Dozers, Excavators and Backhoe from Japan

We're looking for brand new heavy equipment from Japan. This is an urgent requirement.

10 units 10 wheeler dump trucks
5 units dozers
5 units backhoe
5 units excavators

Please respond with specifications, photo/s, location and price.

Please contact us info@msloaneconsulting.com or visit our Website: http://www.msloaneconsulting.com

Thank you.

Used Construction Equipment: for 2.7km Forth Replacement Crossing

Used construction equipment eyes four major contractors: Morgan Est, BAM Nuttall, Balfour Beatty and VINCI Construction Grands Projects, confirmed they will work as an integrated joint venture to participate in the procurement of Transport Scotland’s £1.7 to £2.3 billion Forth Replacement Crossing.

They have joined together as Forthspan to address the demands of this major project which is vital to Scotland’s economy. MSloane Consulting is set to provide high-performing used construction equipment when called for this project.

Forthspan is a strong Scottish-based group that has been formed to prequalify and bid for the UK’s most significant new bridge in 20 years. All four businesses have a solid record of delivering major infrastructure schemes in Scotland and throughout the world and now jointly will provide the full range of skills, resources and technical expertise required for such a large scale project. They will be supported by a world class design team including Halcrow Group, Cowi A/S, (incorporating Flint and Neill partnership) and WA Fairhurst and Partners.

Funded by Transport Scotland, the 2.7km Forth Replacement Crossing will be located to the west of the existing Forth Road Bridge and will provide a new high quality dual carriageway crossing of the Firth of Forth along with associated approach roads, junction improvements and an intelligent transport control system.

Wednesday, July 8, 2009

Equipment Wanted: Wheel Tractor Scraper

Equipment Wanted: We are looking for Brand New or Used Wheel Tractor Scraper(s)

Please respond with Year, Manufacturer, Model, Hours, Location, Price, Specifications and Photo/s.

Visit MSloane Consulting to contact us.




Used Heavy Equipment for Sale for Savings and Increased Mining Output - Great Panther Resources and MSloane Consulting

Great Panther Resources, based in Vancouver, reports cost savings due to tapped used heavy equipment for sale, and also reports that it has produced 499 845 silver-equivalent ounces from its two Mexican mines in 2Q09, a new record for the company and an increase of 15% compared with the same period last year.

One company that had been assisting mining companies and contractors to cut investment and operation costs is MSloane Consulting by understanding companies' equipment requirements and matching these needs to their fleet of used heavy equipment for sale.

Output at the Guanajuato mine rose 19% year-on-year, to 327 295 silver-equivalent ounces, while the Topia mine produced 172 550 ounces of silver equivalent, up 7% from the second quarter of 2008. The company also reported that it has signed new long-term sales contracts for concentrates produced at Topia with Louis Dreyfus Commodities Metals Suisse.

Great Panther Resources says that its steps are on track to meet its target of 2,07-million silver-equivalent ounces for 2009, and is ready to pounce for a higher number.

Tuesday, July 7, 2009

Construction Equipment: Network Rail’s £5.5bn Thameslink Upgrade

Network Rail’s £5.5bn Thameslink upgrade project faces prospect of cuts to beat time and cost overruns, sources close to the project said this week. MSloane Consulting provides used construction equipment to various projects to help companies defray costs.

Thameslink project is set to increase capacity from seven to 24 trains per hour through central London via London Bridge and St Pancras stations, however, there are fears that the landmark glass roof for the £350M Blackfriars station revamp could be axed, although this has been denied by Network Rail. NCE understands that the upgrade is already experiencing delays and cost increases, three months after the main construction phase began.

Most of the capital spend is focused on an 8km section running south of Farringdon station. Overall, the scheme will provide 20,000 extra peak hour seats on trains running into St Pancras.

Monday, July 6, 2009

Mining Equipment: Kilimapesa Gold Mine

Mining Equipment for the Kilimapesa Gold mine project: Situated in the Migori Archaean Greenstone Belt in south-west Kenya, the Kilimapesa Gold mine project is a joint venture between Goldplat and International Gold Exploration. The project came into production in January 2009. MSloane Consulting provides mining equipment for mining companies.


Goldplat made the strategy of developing the ore body for the first year and managing the cost from the development ore. This strategy resulted in increased efficiencies and led to an improvement in the monthly development rate. The end of March 2009 saw the achievement of 70m of mine development. The company is aiming to reach at 100m a month with an expected 500m of vein strike length, and more than 500m of raises being available by the end of 2009.

Goldplat is looking to raise production to 900t per month out of which 750 will be from underground development and the rest from high-grade tailings. It is expected that the average rate will be in excess of 4g/t Au yielding between 4kg (124oz) and 6kg (187oz) Au per month.

Friday, July 3, 2009

Mining Equipment for Sale: The Uranium Michelin Project

MSloane Consulting, the industry's source of mining equipment for sale shares to you that a wholly owned subsidiary of Fronteer Development Group Inc., Aurora Energy Resources, announce that pilot plant leaching and resin-in-pulp (”RIP”) extraction tests on the Michelin and Jacques Lake uranium deposits in Labrador (the “Michelin Project”) provide strong support for the project’s viability and production potential.

Highlights from the pilot plant and bench scale test work tell us that:

1. The Michelin Project mineralization is predicted to yield an average uranium recovery of 87.5%. 2. The proposed milling process for the Michelin Project is an effective method for treating the Michelin Project mineralization. 3. There will only be a modest consumption of energy and consumables. 4. The tailings test results meet Canadian environmental standards.

These metallurgical test results are from one of several engineering and economic studies Aurora commissioned over the last 18 months and that are now in the final stages of completion. Final data relating to Aurora’s tailings-management options, updated resource estimate, scoping study and economic benefits analysis will be reported in the months ahead.


Thursday, July 2, 2009

Mining Equipment Parts Wanted: Tricone Rock Bits: 5" - 26" - US Manufacturers and Suppliers




















We are looking for Tricone Rock Bits: 5" - 26" from US manufacturers, suppliers and distributors.

Please contact us at msloane@msloaneconsulting.com or visit our Website: MSloane Consulting for Mining and Construction.

Thank you.

Dubai Smile - Eye-catching Inverted Metal Bridge and Used Construction Equipment

Dubai's ruler Sheikh Mohammed bin Rashid Al Maktoum has just approved another landmark project that would benefit used construction equipment. The Dubai Smile, an eye-catching inverted metal bridge, has been approved as the seventh river crossing in the emirate and will be completed in 2012.

For used construction equipment, go to MSloane Consulting.

The 12 lane bridge, which is 61.6m wide and has a 100m high arch, will be capable of handing 24,000 vehicles an hour and cost about £110m to build. The bridge will replace Dubai's Floating Bridge over Dubai Creek and aim to reduce appalling traffic congestion.

Wednesday, July 1, 2009

Heavy Equipment for Sale: Silver Falcon Mining will Build its New Mill Facility

Silver Falcon Mining, Inc., approved plans to commence a build-out of a 2,400 sq. foot warehouse structure as its mill facility at this Ridge Road location; contractors have been hired, heavy equipment for sale have been tapped and permits are being pulled for this project as it acquired a 20-acre of property at the base of War Eagle Mountain, Idaho.

For heavy equipment for sale, go to MSloane Consulting.

Silver Falcon Mining is an exploration and development Company specializing in high-grade Gold and Silver mining properties in North America.

Tuesday, June 30, 2009

France's 101km A19 Artenay-Courtenay Highway and Construction Equipment

With 4 million man hours put in by more than 8000 workers and tons of construction equipment, the French government's first eco-motorway and the biggest road infrastructure project to date has been finished.
The 101km A19 Artenay-Courtenay which links A10, A6 and A77, was completed a week ago, four months ahead of schedule. It completes the outer bypass of the greater Paris region.

It is the country's most eco-friendly road thanks to steps taken to prevent any water running off the motorway without being treated first. The road has 107 run-off treatment basins as well as animal crossings and lots of trees to suck up that carbon dioxide. Apart from its environmental credentials, the project is also being praised for its record fast completion.

Monday, June 29, 2009

More Mining Equipment for Gold Fields' 4% Production Increase

Gold-miner Gold Fields, based in South Africa, would again increase its gold production by 4% in the fourth quarter of the 2009 financial year and will probably need more mining equipment.

The company MSloane Consulting sells used and unused mining equipment for the mining indutry anywhere in the world. The company Gold Fields reported last May that it had increased production by 4% to 871 000 oz in the third quarter, saying it was expecting to achieve a similar increase in the fourth quarter.

Production in the three months to end June 30, 2009, was expected to reach about 905 000 oz of gold, with the South African operations increasing production by 2% to about 520 000 oz of gold, compared with 517 000 oz of gold in the previous quarter.

Friday, June 26, 2009

Used Construction Equipment for Nuclear Construction Projects

MSloane Consulting has its radars on any requirements from nuclear construction projects such as used construction equipment.

The recent successful auction of three Nuclear Decommissioning Authority (NDA) sites emphatically displayed the level of optimism surrounding the UK’s new nuclear power construction programme.

The sites were three plots of farmland − 178ha at Wylfa, Anglesey, 48ha at Oldbury, Gloucestershire, and 200ha at Bradwell, Essex − each adjacent to ageing Magnox nuclear power plants, which the NDA was attempting to sell during the biggest recession since the Great Depression.

With property and land prices in falling, the NDA placed a reserve price of £35M on each site and, although it was hopeful of raising more than this, it surely underestimated just how highly treasured these desolate strips of land were. The three sites sold in April for a combined total of £387M, with a joint venture of German generators Eon and RWE Npower buying Wylfa and Oldbury and French generator EDF snapping up Bradwell.

Thursday, June 25, 2009

Used Mining Equipment for Sale and Laser Precision in Mining Automation Applications

Australia's Commonwealth Scientific and Industrial Research Organisation (CSIRO) reports that Modern sensors are delivering data for the creation of 360° digital maps for mine machinery in the harshest conditions.

For used mining equipment for sale, visit MSloane Consulting.

Anyone who has spent even the shortest amount of time in a working mine will know the adversity of the conditions that can exist. An often hostile climate combines with the localised tempests of dust, heat and mist caused by the processes of digging or drilling into the earth to create some challenging environments. Decisions made in such conditions where senses are severely limited (sight especially) have always been subject to significantly increased risk. There is now a universal desire to reduce that risk.

Lasers have found regular but limited use in mining automation applications (such as Load Haul Dump vehicles) and applications of millimetre-radar are under trial with some promise. However, difficult mining conditions still threaten widespread use of both technologies. CSIRO’s ICT Centre identified the need to extend the potential use of these tools by establishing the performance parameters of scanning range sensors under adverse environmental conditions.

Wednesday, June 24, 2009

Heavy Equipment for Sale for the Korshunov Mining Plant in Russia

Mechel OAO, one of the leading mining and metals companies, announces starting production for repair of type 2 BC-105 dump cars at its Korshunov Mining Plant OAO subsidiary and obtaining a permit for the repaired dump cars to be used at railways of Russia

MSloane Consulting on the other hand, regularly announces its latest heavy equipment for sale for buyers anywhere in the world.

To establish the production reconstruction of repairs and mechanics shop was performed, high technology equipment was purchased, and the staff of all services and units involved in process technology was additionally trained. Capital investments in the new production amounted to more than 42 million rubles and 34 new occupations were provided extra.

All activities to start new production including process technology and specifications-supplied unique equipment development as well as construction and erection works were performed in-house without involvement of design companies and contractors allowing for costs minimization.

Mechel is one of the leading Russian companies. Its business includes four segments: mining, steel, ferroalloy and power. Mechel unites producers of coal, iron ore concentrate, steel, rolled products, ferroalloys, hardware, heat and electric power. Mechel products are marketed domestically and internationally.

Tuesday, June 23, 2009

Construction Equipment: M25 UK Highway

The largest project insurance policy has been completed for the £6.2 billion UK highway, M25 widening scheme covering all parties involved up to a policy limit of £25 million.

For construction equipment for sale, go to: MSloane Consulting.

The construction division of Jardine Lloyd Thompson has completed the insurance placement for the M25 contract on behalf Connect Plus, the consortium which has been awarded the contract by the Highways Agency.

The exclusive facility provides 10 year non cancellable insurance covering the professional liabilities associated with the project and is on of the largest. single project professional indemnity programmes ever.

The policy includes material damage insurance for the existing road and infrastructure, business interruption insurance, construction all risks for new works, advance loss of profits insurance, public liability insurance (for all parties including the road operator and building contractor) and environmental insurance.

Monday, June 22, 2009

Mining Equipment for Sale

Please see our mining equipment for sale:
Used Goodwin Barsby Stone Crusher

Asking Price: $425,000 USD
As-is, where-is, FOB Indonesian Port

* Primary crushing circuit Goodwin Barsby 42 x 30 Jaw Crusher
* Stand and Braces
* Guards/ Walkways/ Handrails/ Ladders
* 150 KW Electric Motor
* Vee Belt drive system
* Feed Bin and Braces
* Feeder and 30 KW variable speed drive
* Discharge conveyor with 15 KW drive (in component form)
* Secondary Crusher and Screening Circuit
* Hazemag 1313 Impact Crusher Eljay 16 x 6 Screen Plant
* 200 KW Electric Motor and Vee drive (to suit impact crusher)
* 22 KW Electric Motor and Vee drive ( to suit impact crusher)
* Hydraulic system to suit Impact Crusher (In component form including hydraulic power unit, rams, piping and fitting)
* Disharge Conveyor for Screen
* Discharge Conveyor for Impact Crusher
* Recirculating Conveyor in component form
* Stacker conveyor in component form
* Container Electrical Control Centre
* Caterpillar 3412 Containerised Generator Serial No. 6FA0 and connector to interconnect complete plant
* Crushing and Screening Plant Control Room
* Supports/ Ladders/ Walkways for Control room

Friday, June 19, 2009

Used Mining Equipment for Sale: Anglo Swiss Completes Metallurgical Scoping Study For their Kenville Gold Mine

For used mining equipment for sale, visit MSloane Consulting.

Anglo Swiss Resources Inc., announces that G&T Metallurgical Services Ltd. of Kamloops, British Columbia has completed a Metallurgical Scoping Study for the company’s Kenville Gold Mine Project near Nelson, British Columbia. G& T Metallurgical Services is an integrated mineral process research and development company with laboratories for sample preparation, mineral processing testing, mineralogical analysis and chemical analysis.

The objectives of the Kenville Property study were to: 1) assay the gold, silver, copper, and lead grades of six submitted representative mineralized rock samples, 2) prepare a composite by combining the six submitted samples, 3) determine the grindability of the composite, 4) test gravity concentration techniques to the composite sample, 5) test how the composite responds to the standard flotation technique, 6) determine possible concentrate upgrading techniques, and 7) develop a simplified mineral processing flowsheet.

Thursday, June 18, 2009

Used Mining Equipment for Sale: Foremost MPD 1500 Tracked Tiltable Platform Reverse Circulation Drilling Rig

Here is one of our used mining equipment for sale: Foremost MPD 1500 Tracked Tiltable Platform Reverse Circulation Drilling Rig



  • With 90,000 lb pullback.
  • 10,000 hrs but has completely overhauled in 2006 and has been in dry storage since.
  • Comes with a very comprehensive spares package including many engine, compressor, new drill bits and 2 new hammers etc.
  • Top head was over hauled and all new seals ready to go to work.
  • Comes with very good condition low loader with removable goose neck, also with spares, wheel tyres, hydraulic pipes, etc.
  • Also included is 900 ft of double walled drill pipe.
  • As is, where is.
Contact us for more information, visit MSloane Consulting.

Wednesday, June 17, 2009

Heavy Equipment for Sale: (2) 7 Megawatt V16 Enterprise Genset Power Plant

Heavy Equipment for Sale: (2) 7 Megawatt V16 Enterprise Genset Power Plant
  • Manufacturer Louis Allis
  • Type TBGZBDJP
  • Frame 1X-34
  • Volts 4160
  • Duty Continuous
  • KVA 8750
  • KW 7,000
  • Phase 3
  • Hertz 60
  • F L Amps 1214
  • PF .08
  • RPM 450
  • Ins Class F
  • Temp Rise 80
  • Max AMB 40
  • Field Amps 4.5A
  • Field Volts 100
  • Stator weight 29,912 lbs
  • Rotor weight 41,170 lbs
  • Total weight 80,900 lbs
  • Phase sequence ABC T1.T2.T3
  • CW Rotation Facing Conn End
Contact us for more info: MSloane Consulting

Monday, June 15, 2009

Mining Equipment: Forrestania Nickel Project

Western Areas plans to develop five mines at the Forrestania Nickel Project site by 2011 increasing their need for mining equipment, with targeted production of 35,000t per annum of nickel.

The Forrestania Nickel Project is located 400km east of Perth, Western Australia. The first mine to be developed is the Flying Fox containing some of the highest grade nickel in the world. The project also includes Archean Greenstone belts and substantial exploration potential. Two additional planned underground mines - Cosmic Boy and Diggers South - are wholly owned by Forrestania Nickel Project.

MSloane Consulting can help you assess whether brand new or used mining equipment is best for a particular mining function or for an entire project based on your financial position, project life-cycle, and post-project equipment valuation, asset liquidation and disposition scenarios.

The first stage is fully commissioned with an ore capacity of 300,000tpa. The second stage is scheduled for March 2010 to treat ore from the Spotted Quoll mine. Major infrastructure such as grid power, roads, water, tailings disposal and an airstrip is set for completion during the second stage.

Western Areas’ objective is to increase the capacity of the high-quality mineral resources at Forrestania to 40,000t of nickel in 2009. The Flying Fox mine started production in 2008 and produced 200,597t at 4.05%, containing 8,118t of nickel in concentrate.

Friday, June 12, 2009

Used Mining Equipment for Sale: La Colosa Porphyry Gold Project in Colombia

In the city of Bogota in Colombia, used mining equipment for sale are apparently hot as project proponents of the La Colosa porphyry gold project are setting up operations. The La Colosa porphyry gold project's drilling and resource modelling is defined as a porphyry system with a grade of more than 0.3g/t Au extending over a strike length in excess of 1,500m. It has an inferred mineral resource of 381.4Mt at 1.00g/t Au for 12.3 million ounces of gold at a gold price of $1,000 per ounce and a lower cut-off of 0.3g/t Au.

In the photo, you will see a drilling activity. Used mining equipment for sale are now widely considered to save on equipment procurement and maintenance costs.

MSloane Consulting
can help you assess whether brand new or used mining equipment is best for a particular mining function or for an entire project based on your financial position, project life cycle, and post-project equipment valuation, asset liquidation and disposition scenarios.

AngloGold Ashanti explored the site in 2006, followed by initial JORC-compliant resource estimation in May 2008. AngloGold announced an initial inferred resource of 468.8 million ounces at 0.86g/t gold totalling 12.9 million ounces.

Thursday, June 11, 2009

Used Mining Equipment for Sale: Goodwin Barsby Stone Crusher

Used Mining Equipment for Sale: Goodwin Barsby Stone Crusher



Asking Price: $425,000 USD

As-is, where-is, FOB Indonesian Port

* Primary crushing circuit Goodwin Barsby 42 x 30 Jaw Crusher
* Stand and Braces
* Guards/ Walkways/ Handrails/ Ladders
* 150 KW Electric Motor
* Vee Belt drive system
* Feed Bin and Braces
* Feeder and 30 KW variable speed drive
* Discharge conveyor with 15 KW drive (in component form)
* Secondary Crusher and Screening Circuit
* Hazemag 1313 Impact Crusher Eljay 16 x 6 Screen Plant
* 200 KW Electric Motor and Vee drive (to suit impact crusher)
* 22 KW Electric Motor and Vee drive ( to suit impact crusher)
* Hydraulic system to suit Impact Crusher (In component form including hydraulic power unit, rams, piping and fitting)
* Disharge Conveyor for Screen
* Discharge Conveyor for Impact Crusher
* Recirculating Conveyor in component form
* Stacker conveyor in component form
* Container Electrical Control Centre
* Caterpillar 3412 Containerised Generator Serial No. 6FA0 and connector to interconnect complete plant
* Crushing and Screening Plant Control Room
* Supports/ Ladders/ Walkways for Control room

For this used mining equipment for sale, contact MSloane Consulting.

Used Construction Equipment: Crossrail's Canary Wharf in London





Crossrail reached its first major construction milestone after the installation of the first tubular steel piles for the newly renamed Canary Wharf station. This is the beginning of the £15.9bn mega rail project.

In the photos, you will see the first pile installed, and renderings of the Canary Wharf. Used construction equipment are now widely used to save on equipment procurement and maintenance costs.

MSloane Consulting
can help you assess whether brand new or used construction equipment is best for a particular construction function or for an entire project based on your financial position, project life cycle, and post-project equipment valuation, asset liquidation and disposition scenarios.

Crossrail's route will stretch 118km from Maidenhead and Heathrow in the west, through 21.5km of twin bored tunnels through central London, and on to Canary Wharf, Woolwich, Abbey Wood and Shenfield in the east.

Surveying and enabling works are already well underway at many locations along this route and the property acquisition process has also begun. And last weekend saw the closure of Charing Cross Road in London’s West End as plant was mobilised ready to tackle the demolition of buildings around Tottenham Court Road Underground station. This is being upgraded as part of London Underground improvement works and will also interface with a Crossrail station.

But all eyes are now on Canary Wharf station − known as Isle of Dogs until last week when it was renamed by developer Canary Wharf Group which is putting £150M into its construction. It will be the first station to be complete along the route and is scheduled to be ready for handover to Crossrail by summer 2012.

At that point the station will comprise a watertight cofferdam in the North Dock of West India Quay, running along the northern edge of Canary Wharf.

Once complete it will be ready to welcome the tunnel boring machine that will be working its way westward from the Limmo Peninsula across the Thames to the east.

Wednesday, June 10, 2009

Heavy Equipment for Sale: New Nickel Mineralization Discovered in Timmins, Ont.

Golden Chalice Resources announces their discovery of new nickel deposits approximately 500 meters east of the Langmuir Nickel Discovery Zone at its Langmuir Property, 35 km southeast of Timmins, Ont.

Mining equipment will soon move in position to mine this area. For heavy equipment for sale, for your mining operarions, visit MSloane Consulting.

Hole GCL09-11, the last hole of the 2009 winter drilling program, returned elevated nickel mineralization grading up to 0.34% nickel over a 2.4-meter drilled width from 372.50 to 374.90 meters, which includes 0.5% nickel over 0.7 meters.

The host rock is a channel peridotite flow horizon similar to that hosting the Langmuir Nickel Discovery Zone (W4), where drilling in May of 2007 had intersected 1.14% nickel over 72.5 meters., and the recent significant W2 Nickel Discovery of 1.72% nickel over 3.0 meters , about 1.5 km east of the Langmuir Nickel Discovery Zone. Company geologists have not yet determined whether this is a new channel flow horizon hosting nickel sulphides or is the same flow horizon hosting nickel mineralization in either the Langmuir Nickel Discovery Zone (W4) or the W2 Discovery.

Tuesday, June 9, 2009

Construction Equipment: Volga and Novatek Oil & Gas and Infrastructure Projects

Funds and construction equipment will flow to Russia's Novatek oil & gas and infrastructure as projects as Volga Resources SICAV-SIF S.A, the Luxembourg-based investment company, announced that it has agreed to purchase 13.13% shares of OAO Novatek from Cartagena Development Inc. which is indirectly controlled by Novatek’s management. This move brings Volga’s total holding in Novatek to 18.2%.

The founder and largest shareholder of Volga, Guennadi Timtchenko was elected to the Board of Directors of Novatek. After meeting all regulatory approvals, the share purchase transaction will be completed.

Volga Resources SICAV-SIF S.A. is a private investment company registered in Luxembourg in 2007. The company is involved in various projects in the oil & gas sector, infrastructure, development, financial services in Central and Eastern Europe, CIS, Russia and Turkey, through its investments.

OAO NOVATEK is Russia’s largest independent gas producer and the second-largest natural gas producer in Russia. Founded in 1994, the company is engaged in the exploration, production, processing and marketing of natural gas and liquid hydrocarbons. The company’s upstream activities are concentrated in the prolific Yamal-Nenets Region, which is the world’s largest natural gas producing area and accounts for over 90% of Russia’s natural gas production and 20% of the world’s gas production.

Monday, June 8, 2009

Brazil El Dorado Corporation and Mining Equipment for Sale

Eldorado Gold Corporation has advised Brazauro that during the nine month period from August 2008 through the first quarter of 2009 it has expended C$5.1 million on Brazauro’s Tocantinzinho Project in Brazil for exploration, drilling, capital expenditures and other related matters. Under the terms of the Option/Joint Venture Agreement between Brazauro and Eldorado, before Eldorado may exercise its options to acquire up to a 75% interest in the Tocantinzinho Project, Eldorado must spend not less than C$9.5 million in qualified expenditures such as for mining equipment by July 28, 2010.

For mining equipment to Brazil, contact MSloane Consulting.

Friday, June 5, 2009

Used Mining Equipment for Sale for Vietnam

PHI Mining Group, Inc., a majority owned subsidiary of Providential Holdings, Inc., announced that Truong Son Metal Mineral Joint Stock Company (TSM.CO), a joint venture company between Vietnam-based Truong Son General Group of Youth Volunteers and PHI Mining’s wholly owned subsidiary Indochina Mining Corporation (IMC), has been granted the corporate registration certificate by Tuyen Quang Province, Vietnam, to engage in the exploitation of nonferrous ores and the production of lead, zinc and tin alloys. Initial chartered capital of TSM.CO is set at 83 billion Vietnamese Dongs, or equivalent to $4,760,540 at the current exchange rate of VND 17,435 to $US1.

For used mining equipment for sale for Vietnam, contact MSloane Consulting.

Thursday, June 4, 2009

Used Construction Equipment: 2012 Olympic Games Velodrome, London

The foundations for the 2012 Olympic Games Velodrome site are now complete, with more than 900 piles driven to complete foundations for the 6,000-seat venue

In the photo, you will see an excavator with its boom being used to hold the concrete container as concrete is poured into the pile. Used construction equipment are now widely used to save on new equipment procurement and maintenance costs.

MSloane Consulting
can help you assess whether brand new or used construction equipment is best for a particular construction function or for an entire project based on your financial position, project life cycle, and post-project equipment valuation, asset liquidation and disposition scenarios.

This Velodromes is being set up for the London 2012 Olympic and Paralympic Games as it will host the indoor Track Cycling. Next to the Velodrome is a BMX circuit which will be built to host the BMX events during the Olympic Games. Together they will form the London 2012 VeloPark.

In legacy, a Road Cycle circuit and Mountain Bike course will be added to the VeloPark to create a cycling hub for all ages and abilities.

Wednesday, June 3, 2009

Heavy Equipment for Sale: Kendal Coal

Homeland’s Kendal Colliery coal beneficiation or processing plant was shut down from 13 April 2009 to 23 April 2009 plant upgrades and improvements.

For heavy equipment for sale, to upgrade and improve your operations, contact MSloane Consulting.

Now, the Kendal plant is running at +20% better than original plant capacity, and plant yields are in the +50% range, a significant increase over the yields from previous months and is expected to produce in excess of 60,000 tonnes per month of saleable coal. Management expects total operating costs will be in the range of ZAR270 to ZAR300 per saleable tonne at full production (US$29.45 to US$32.50 at current exchange rates). March production was 109,639 ROM tonnes, in line with budget.

Plans for Kendal include a further production expansion in 2010 to increase the monthly ROM from approximately 120,000 tonnes per month to approximately 180,000 tonnes per month. Homeland owns 74% of the Kendal Colliery with the remaining 26% owned by Homeland’s Black Economic Empowerment (BEE) partner.

Tuesday, June 2, 2009

Construction Equipment and Commercial Property Market's Tentative Recovery

The commercial property market in the U.K. just started a "tentative" recovery, according to surveys of developers, contractors and suppliers of construction equipment.

Developers and contractors told that they had seen an increase in the number of commercial property completions with a value of £40,000 and above in March.

Used construction equipment contributed to the completion of some critical real estate projects. MSloane Consulting provides used construction equipment worldwide.

A commercial real estate review showed that there were 9,000 commercial transactions for the month - the highest recorded number since October last year.

A head of a real estate and construction department at an accountancy firm said that the tracker shows a number of encouraging indicators which have been absent over the past 18 months. The easing of credit conditions and opportunistic transactions by cash rich investors, suggests that the property investment market may stage a tentative recovery in the coming months.

Monday, June 1, 2009

Brazilian Mining Corporation's Diamondiferous Kimberlite

For mining equipment for mining diamondiferous kimberlite, visit MSloaneConsulting.

In the most recent geological report for property 231, the Brazilian Mining Corporation announced the discovery of a diamondiferous kimberlite. A satellite remote sensing study used in advanced multi-spectral diamond exploration has found several kimberlites containing in this part of the Sao Luis River Basin diamond venture. The Sao Luis River Basin territory consists of two properties totaling 6,863 acres. This is located in Mato Grasso, near the town of Juina in Brazil.

Friday, May 29, 2009

Uranium and Used Mining Equipment for Sale

Uranium miner Uranium One, after its stock drop almost 40% in Toronto on Wednesday, regained some lost ground on Thursday. Shares in Uranium One rose 21% to C$2,42 apiece by 15:59 ET.

This happened while the demand for used mining equipment for sale rose by 15 points from the past month due to various mining operations in Africa, Western Asia, South America are strengthening. For used mining equipment for sale, contact MSloane Consulting.

In Johannesburg, South Africa, where the company's stock is more thinly traded, shares fell 4,86% for the day, to R17,60 each, after falling as low as R15,00 earlier in the day.

After arresting the head of State, Kazakhstan's National Security Committee said that it was investigating deals made by the disgraced CEO, who had “illegally” sold stakes in uranium assets. The KNB said that the sale of 30% in the Kyzylkum joint venture, which owns the Kharasan mine, was one of the transactions being investigated.

Thursday, May 28, 2009

Construction Equipment and the M25 Highway in London

Work to upgrade and maintain the M25 highway began right after the deal was inked worth £6.2bn of road widening design, build, finance and operate (DBFO) PFI last week, involving engineers, construction workers and construction equipment.

For construction equipment for sale for any road project, visit MSloane Consulting.

Speaking to the media after closing the deal last week, winning consortium Connect Plus chief executive Tim Jones said: “We started work last night. We have been on clearing the verges and removing white lines and chevrons.” Jones added that more significant work would begin today with the start of verge excavation and contraflows introduced.

Connect Plus comprises Balfour Beatty, Skanska, Atkins and Egis Projects. The M25 concession will run for 30 years and involves widening the motorway at key points from three to four carriageways in each direction. In addition, the existing road will be resurfaced and central reservations and lighting will be replaced.

Wednesday, May 27, 2009

Timberline Resources and Heavy Equipment for Sale

Peaking a recent trend in renewed mineral exploration, Couer D’Alene, Idaho-based Timberline Resources Corporation is looking to undertake a major exploration and drilling operation for gold at the Butte Highlands area, just 15 miles south of the city.

Heavy equipment for sale for exploration and drilling are available at MSloane Consulting.

Timberline Resources is an operations-based mineral cumpnee–focused mostly on the nitty-gritty aspects of exploration and drilling as opposed to processing or distribution.

Their project near Butte began quietly back in 2007, when they did some initial drilling, and began eyeballing a 150-acre parcel of adjacent property to buy. They also began pitching industry partners and contractors to help facilitate the operation. By the time 2009 rolled around, they’d discovered high-grade gold, gotten a 50/50 partnership with Boise-based Small Mine Development, and were set to submit exploration filings with Montana’s Department of Environmental Quality (DEQ).

Tuesday, May 26, 2009

Construction Equipment - MSloane Consulting: Ausenco and Newcrest Mining

Engineering firm Ausenco has been awarded an engineering, procurement and construction management contract for Newcrest Mining’s Gosowong gold extension project in Indonesia, valued at $US76 million.

MSloane Consulting assists in the marketing, evaluation and procurement of construction equipment.

Monday, May 25, 2009

Sabodala Gold Mine and Mining Equipment

Sabodala Gold Mine in Senegal has completed production of its first ton, after starting operations back in April.

For mining equipment for sale, contact MSloane Consulting.

The $220m project is set to process material above the nominal mill capacity of two million tons per annum. The project is expected to produce 160,000oz of gold in 2009 at a cash operating cost between $420 and $440 an ounce.

The Senegal Government has a 10% stake in Sabodala Gold Operations, which operates the mine.

Friday, May 22, 2009

Low Cost Used Mining Equipment for Sale and Rio Tinto Cuts 33% of its Iron Ore Prices

Global miner Rio Tinto agreed on a 33% cut in contract for fine iron ore prices with Japan's Nippon Steel Corp, which sets a benchmark for the costs of steelmaking after prolonged negotiations.

For low cost used mining equipment for sale, go to MSloane Consulting.

Assuming rival BHP Billiton concludes a similar deal with Japanese and South Korean mills, as is the usual practice, the pressure will shift to Chinese steelmakers such as Baosteel that have fiercely resisted anything less than a 40% to 50% reduction in prices to 2007 levels.

The long overdue settlement for contracts beginning from April will bring some certainty to both miners and mills, which have been in deadlocked talks as demand for both steel and its main raw material collapses in the wake of a global recession.

Wednesday, May 20, 2009

Turbinomic and Heavy Equipment for Sale

This is an innovative design by Oklahoma architect Rand Elliott for an oddly-shaped tower incorporating wind turbines.

For heavy equipment for sale, go to MSloane Consulting.

Turbinomic is designed to make the most of wind turbulence around it, by allowing the wind to drive circular belt turbines incorporated into the building's skin.

These turbines are placed horizontally between each floor to generate power for the structure. They are independent and can be activated by wind from any direction.

Elliott calls it 'architecture that works, rather than being static and energy absorbing/consuming'.