
For used construction equipment, go to MSloane Consulting.
The 12 lane bridge, which is 61.6m wide and has a 100m high arch, will be capable of handing 24,000 vehicles an hour and cost about £110m to build. The bridge will replace Dubai's Floating Bridge over Dubai Creek and aim to reduce appalling traffic congestion.
No comments:
Post a Comment