https://www.youtube.com/watch?v=6IkIoS5_noQ
Mike Sloane
B&G Machine
Mining Equipment: Melkior Resources will soon begin using drilling machinery at the Eldorado nickel property as they have begun line cutting and ground geophysical surveying on grids on the Eldorado nickel property. MSloane Consulting has a unused drill equipment available for sale located in Australia.1 Unit of 2008 Atlas Copco 282 Rail Drill
(Click on the thumbnails on the right to view a larger photo)
Mining Equipment: Dominion Mining is increasing the processing capacity of its Challenger gold mine in Australia to 530,000t per year, through an expansion of the mine's processing unit that is currently under way. The expansion to be completed in December 2011 -- will boost gold production from 2008-09 levels of 98,755oz to 120,000oz per year. In 2005, the open-pit Challenger gold mine was successfully converted into an underground operation.
225MW Power Plant with 21 Sulzer 16ZAV40S HFO Diesel Engines- Units: Sulzer 16ZAV40S Engine x 21
- Call for price (negotiable)
- Hours: 40,000 approx
- Location: Luzon, Philippines
- Fuel: Diesel Bunker "C" Fuel
- With original spare parts
The plant, with an initial contracted capacity of 215 MW which was increased to 225 MW beginning January 1997, generates power using twenty-one (21) Sulzer ZAV40S diesel engines with Alstom Generators operating synchronously. The diesel engines were manufactured and supplied by New Sulzer Diesel of France.
With ISO 14001:2004 Certification from Certification International.
This plant is for immediate sale.

90MW Power Plant with 5 Pielstick 18PC4 HFO Diesel Engines
- Units: 18MW Pielstick 18PC4 Engine x 5
- Price: $708, 000 each (as is, without overhaul or Hz conversion)
- FOB Plant
- Location: Philippines
Units need to be overhauled as they have been idle. Cost for overhaul: Minimum $86,950 USD to maximum of $260,898 (per engine depending on condition of engines when taken down).
Cost for overhauled engines turned back to zero hours, 60Hz: Minimum $794,956 USD to maximum $968,898 USD per engine.
Can be converted to 50Hz but will reduce power output by 17%-20%. Cost for overhauled engines turned back to zero hours with 50Hz conversion is minimum $849,956 USD to maximum $1,023,898 USD per engine.
We can provide overhauling done by ISO certified companies. We can also help in transport quote and recommissioning of plant.
3.3MW Power Plant with Wartsila Vasa 9R32 HFO Diesel Engine and Auxiliaries with Complete Manuals and Special Tools
- Price: $426, 000 USD or best offer
- FOB site
- Location: Philippines
The engine was manufactured in 1989 and all preventive maintenance for the engines and auxiliaries were all done by Wartsila Philippines. The engine is very well maintained and parts are all original Wartsila and recently underwent 80,000H PMS, wherein the engine had been practically placed to ZERO HOUR. This is one of the best small plants operated in the Philippines considering that it was previously owned by Unilever, a multinational company.
Please feel free to contact us for your inquiries. Thank you.

Mining Equipment: Major South African gold mining company Harmony sees the Free State assets it bought from Pamodzi Gold to produce around 100 000 oz over the next 12 months with its purchased mining equipment. Harmony said that it is expecting production from the Steyn 1, Steyn 2 and Lorraine 3 shafts to 150 000 oz in the second 12-month period. During the past few months, Harmony conducted preproduction work at the Pamodzi shafts to make the operations safe and return them to production.
225MW Power Plant with 21 Sulzer 16ZAV40S HFO Engines- Call for price (negotiable)
- Hours: 40,000 approx
- Location: Luzon, Philippines
- Fuel: Diesel Bunker "C" Fuel
- With original spare parts

90MW HFO Power Plant with Five (5) 18PC4 Pielstick Engines
- Units: 18MW 18PC4 Pielstick Engines x 5
- Price: $708, 000 each (without overhaul or Hz conversion)
- FOB Plant
- Location: Philippines
3.3MW Wartsila Vasa 9R32 HFO Engine and Auxiliaries with Complete Manuals and Special Tools
- Price: $426, 000 USD or best offer
- FOB site
- Location: Philippines
Contact us for inquiries.
Thank you.
225MW Power Plant with 21 Sulzer 16ZAV40S HFO Engines- Call for price (negotiable)
- Hours: 40,000 approx
- Location: Luzon, Philippines
- Fuel: Diesel Bunker "C" Fuel
- With original spare parts

90MW HFO Power Plant with Five (5) 18PC4 Pielstick Engines
- Units: 18MW 18PC4 Pielstick Engines x 5
- Price: $708, 000 each (without overhaul or Hz conversion)
- FOB Plant
- Location: Philippines
3.3MW Wartsila Vasa 9R32 HFO Engine and Auxiliaries with Complete Manuals and Special Tools
- Price: $426, 000 USD or best offer
- FOB site
- Location: Philippines
Contact us for inquiries.
Thank you.
3.3 MW Wartsila Vasa 9R32 Engine and Auxiliaries with Complete Manuals and Special Tools
Mining Equipment: Nebu Resources Inc. continues drilling on its Denton Township projects adjacent to properties held by Lakeshore Gold Mines Inc., approximately 30 kilometers southwest of Timmins, Ontario since they resumed in December 2009, in the area of high-grade gold mineralization reported in its November 30, 2009 press release, to continue evaluation of this area of gold mineralization.While the latter intersection is deeper, it should be noted that this intersection is still less than 120 metres below surface, whereas much of Lakeshore Gold’s recent success has resulted from drilling holes to depths of more than 700 metres vertically.
Mining Equipment: The Voorspoed mine, owned by De Beers Consolidated, continues diamond production after its ramp-up activities began in July 2008 while MSloane Consulting continues to provide mining equipment to mining operations worldwide. It is located 30km north-east of Kroonstad, in the free-state province of South Africa. The tenure of the mine is 12-16 years, including activities such as pre-stripping, ramp-up production and closure. The mine is expected to have a full capacity production of 800,000 carats per year. The company ramped up production levels from 60,000 carats in October 2008. Over ten million carats are expected to be generated during the life of the mine.

Mining Equipment will be busy working on uranium production at the Arizona 1 Uranium Project, owned by Denison Mines, which is expected to begin in the first quarter of 2010.
Mining Equipment: The UK begun to explore trade and investment opportunities in the Orissa as it is there is currently an industrialization boom and it's economic growth at a speedy pace. MSloane Consulting on the other hand provides consulting, valuation, procurement, marketing, acquisition and disposition of mining equipment for companies around the world. Recently, MSloane Consulting added truck hauling services with its fleet of dump trucks for the Philippine market.
It has identified sectors like metals and minerals, mining, advanced engineering, infrastructure and education as key areas for business cooperation. A high-power delegation led by British Deputy High Commissioner Sanjay Wadvani is on a two-day visit here to examine the scope for furthering business and investment ties.Speaking on the sidelines of a joint business session organised by the British Deputy High Commission and the Confederation of Indian Industry, Orissa chapter, Wadvani said the UK had extensive trade ties with India to the tune of 12.6 billion pound sterling and as many as 500 companies had invested here. India too had an investment of $ 9 billion with 200 companies.

Mining Equipment / Power Generation: 225 MW Power Plant with 21 Sulzer ZAV40S Diesel Engines for Sale. The plant, with an initial contracted capacity of 215 MW which was increased to 225 MW beginning January 1997, generates power using twenty-one (21) Sulzer ZAV40S diesel engines with Alstom Generators operating synchronously. The diesel engines were manufactured and supplied by New Sulzer Diesel of France.
Each unit burns Bunker "C" fuel, operates at an engine speed of 514 RPM and generates a gross output of 11.5 MW. It is fully operational.
This plant is for immediate sale.
With ISO 14001:2004 Certification from Certification International.
Mining Equipment: Mawson Resources Limited announced that they have started proceedings to expand its uranium exploration in Scandinavia while withdrawing its mineral exploration in Spain. MSloane Consulting on the other hand, provides mining equipment to mining companies worldwide.They have determined that Scandinavia holds the largest potential for further uranium discoveries. Mawson Resources will increase its exposure in Sweden and Finland by expanding their project generation efforts, by exploring forling around uranium resources and through potential further acquisitions.
Mining Equipment: MSloane Consulting provides consulting, acquisition and disposition services of mining equipment gear for the mining industry.
MSloane Consulting Mining Equipment: Black Hawk Exploration incorporates wholly owned Gold Exploration subsidiary “Golden Black Hawk” as MSloane Consulting continues to provide appraisal, procurement, acquisition, marketing, and disposition services on mining equipment for companies worldwide. Black Hawk Exploration is a diversified energy and metals exploration company focused on identifying, acquiring and exploring strategic high value properties and developing new prospective projects globally. Further to its previous announcement in late September 2009 Black Hawk Exploration will continue to establish wholly owned corporate identities in multiple strategic minerals, high value commodities, and rare earth projects.
Mining Equipment: Molejon Gold Project. Petaquilla Minerals Ltd. who has 100% ownership of the Molejon Gold Project announce that the Government of the Republic of Panama has granted approval for Petaquilla’s Molejon gold mine to advance to the commercial production stage as MSloane Consulting provides mining equipment to mining projects worldwide. Testing of production commenced resulting in the Company’s first gold pour on April 7, 2009, and the mine has produced a total of 25,699 ounces of gold since then.
MSloane Consulting, providing mining equipment to various mining companies around the globe, received news today that Golden Minerals Company said that the sale of their remaining 49% joint venture interest in the Platosa property to Excellon Resources for US $2.0 million in cash and a 1% net smelter return royalty. Previous agreements between the Company and Excellon, including a 2% net smelter return royalty previously granted, were terminated in this transaction. Definitive agreements have been executed, titles to the claims have been transferred and the US $2.0 million cash payment has been made by Excellon.