Thursday, October 1, 2009

Used Construction Equipment: 1993 Manitowoc M250T Truck Crane

Used Construction Equipment for Sale: 1993 Manitowoc M250T Truck Crane

Price: 2,829,440 USD (Negotiable)
Weight: 300 Tons
Location: Mount Gambier, South Australia
Hours: 8,000 on upper deck 2,000 on car body.

The crane was refurbished and painted about 12 months ago.

For more information, visit our Website: Used Construction Equipment

Wednesday, September 30, 2009

Heavy Equipment for Sale:

Heavy Equipment for Sale: The Wodgina direct shipping ore (DSO) project is located 100km south of Port Hedland in the Pilbara region of Western Australia. MSloane Consulting provides heavy equipment for sale worldwide. Wodgina is part of the Greater Abydos project and adjoins the great northern highway, the FMG railway line and BHPB railway line.

Wodgina’s production is expected to commence in January 2010 at a rate of 2mtpa. The production rate is expected to reach 3mtpa by June 2010. The initial production of the mine will be low-alumina fines-only products.

Atlas signed a facility agreement with Hedland Port Authority, to get access to public facility at Utah Point in November 2007. The five-year agreement with a three-year option allows export of 3mtpa by Atlas. Under the agreement, facility, berth, stockpile and handling area will be given to Atlas by PHPA on commercial rates.

Tuesday, September 29, 2009

Construction Equipment: Kittila Gold Mine

Construction Equipment: Road construction and other infrastructure is on-going at the Kittila gold mine in preparation for its mining operations. MSloane Consulting provides used construction equipment as well as mining equipment worldwide.

The Kittila gold mine is located 900km to the north of Helsinki, Finland, at the Suurikuusikko gold deposit. It was constructed in 2006 and has an approximate gold reserve of 3.2 million ounces.

Named after the community that resides nearby, the mine is poised to become one of the largest gold-producing mines in Europe. Its commercial production began in September 2008 and the first gold was poured in January 2009.

Monday, September 28, 2009

Mining Equipment: Bonanza Goldfields Acquires 160-Acre Mining Claim Targetting a Large Gold Vein

MSloane Consulting provide mining equipment worldwide.

Mining Equipment: Bonanza Goldfields Corp. said it has completed the acquisition of a 160-acre unpatented placer mining claim (Claim # 4) located in the Northeast 1/4 Section 29 on the Black Rock Basin (BRB) in Mariopa County, Arizona. The property lies adjacent to the Company’s recently acquired BRB Claim # 3, which was announced on September 24, 2009.

Friday, September 25, 2009

Used Mining Equipment for Sale: Borealis Oxide Project in the Walker Lane Belt of western Nevada

Used Mining Equipment for Sale: Gryphon Gold Corporation released a progress update for the proposed development of its wholly owned Borealis Oxide Project in the Walker Lane Belt of western Nevada.

MSloane Consulting provides valuation, procurement and marketing services for used mining equipment for sale.

It said that negotiations are under way for the final price and construction schedule of a turnkey Absorption, Desorption and Recovery (”ADR”) plant that will incorporate the most advanced technology for the adsorption, desorption and precipitation of gold and silver. The anticipated final design and construction schedule for the ADR plant project is 20 weeks.

Also, bid packages were issued for the construction of the initial heap-leach pad and site visits were conducted. The bid opening is scheduled for September 28, 2009.

Approval is expected shortly for the final heap-leach pad design previously submitted for approval to the Nevada Division of Environmental Protection.

The first of two water wells has been pump-tested. The design of the second water well is near completion, with installation expected in early November.

As well as the negotiations with NV Energy are under way for installation of the 55-kv power line to the Borealis plant and potential power installation to the water-well location.



Thursday, September 24, 2009

Used Construction Equipment: UK Economy Expected to Grow in the Final Quarters of 09

Used Construction Equipment: The UK economy is expected to bounce back from recession through modest growth in the third and fourth quarters of this year. Constraints on demand though will ensure that growth in 2010 is fragile, the CBI said. It also said that the near-term economic prospects are brightening. A recovery is underway in the global economy, which has been boosted by substantial fiscal and monetary stimuli, and the inventory cycle is starting to turn, both at home and abroad, which is helping to lift production. However, the pace of recovery in 2010 is expected to be slow.

MSloane Consulting predicts demand for used construction equipment to increase in the UK in the coming months as the economy recovers even as deals are nowadays are fairly on the uptrend as companies turn to used construction equipment during hard times to manage their cashflow.

The CBI predicts that UK GDP will post quarter-on-quarter growth of 0.3% in 2009 Q3, edging up to 0.4% in Q4 as consumers bring spending forward in advance of the VAT increase in January. However, this will dampen spending in early 2010 and although companies may be rebuilding stocks, they are likely to do so very cautiously. As a result, 2010 should start with very weak growth of only 0.1% in Q1 2010, and 0.3% in Q2.

Wednesday, September 23, 2009

Heavy Equipment for Sale: Miner African Rainbow Announces Expansion

Heavy Equipment for Sale: African Rainbow Minerals (ARM), a diversified South African miner plans to invest in coal and platinum group metals (PGM) projects in Zimbabwe a report says..

"We are looking for PGMs and we are looking for coal. We are in discussion with a number of people in Zimbabwe to see whether there is something we can get on in terms of exploration," Dan Simelane, ARM's chief executive for exploration said in an interview on Wednesday.

He said authorities in Zimbabwe had improved the investment climate since the formation of a government by President Robert Mugabe and his rival Morgan Tsvangirai in February.

The new power-sharing government in Zimbabwe, which has the world's second-biggest platinum reserves after South Africa and large deposits of diamonds, coal and nickel, is keen to attract foreign mining companies to invest into a sector shunned due to fears that businesses could be expropriated.

Wednesday, September 16, 2009

Heavy Equipment for Sale: Report Shows Long Term Benefits of Gold Mining to Developing Economies

Heavy Equipment for Sale: Large-scale gold production has been found to be a major factor in bolstering the economies of developing countries, according to a key report issued today by the World Gold Council (WGC) in partnership with the International Council on Mining & Metals (ICMM) and Oxford Policy Management.

MSloane Consulting is ready to supply heavy equipment for sale for gold mining operations.

The new report, ‘The Golden Building Block: gold mining and the transformation of developing economies’, authored by Maureen Upton, Sustainability Advisor to World Gold Council, considers the macroeconomic benefits of gold production in developing countries. The report takes into account the well-debated resource curse theories, and examines evidence of actual contributions through an in-depth case study of Tanzania and the effects of gold mining on its economy over a 40-year period.

The report also reviews case studies undertaken within the ICMM’s Resource Endowment initiative, analysing the costs and benefits of mineral extraction in Chile, Ghana, Peru and Tanzania. The final section seeks to provide observations on policy approaches and conditions likely to positively impact the economic contribution of gold mining more generally across other developing countries.

Monday, September 14, 2009

Mining Equipment: EurOmax commences diamond drilling at Ceovishte project, Serbia

Mining Equipment: EurOmax Resources Limited announce that it has commenced a 13 square kilometre geophysical program and a 2,500 metre diamond drilling program at Ceovishte to test two large gold bearing breccia bodies.

During 2008 EurOmax completed a detailed mapping and soil geochemistry program defining a 6 kilometer long zone of strongly altered andesite volcanics and intrusives with abundant ancient mine workings. Drilling at the northern end of this trend by EurOmax in 2008 intersected multiple gossan and massive sulphide intervals, one of which reported 12.4 metres at 1.5% copper, 1.4% lead, 0.8% zinc, 62 g/t silver and 1.6 g/t gold. This program also defined a 3 kilometre by 2 kilometre magmatic complex at the southern end of the trend which remained undrilled in 2008. This feature is now the focus of the 2009 exploration program.

Friday, September 11, 2009

Used Mining Equipment for Sale: Caterpillar, Detroit and Mitsubishi Generator Sets





















Used Mining Equipment for Sale:

Contact us msloane@msloaneconsulting.com for more information. Thank you.

(15) Generator Sets
(1) High Voltage Switch Gear
(3) Transformers
(2) Chillers

==========================================
1) Caterpillar SR4 313KVA Generator
==========================================

* Hours: 1177

* Rating of 313kva, 250 kw, cosO 0.8 standby 60 hz, 3 phase
* 10 wires, WYE connected, series connection
* 480 volts, 376 amp., excitation 35 volts, 7.1 amp.
* rev. 1800/min.
* temp. rise 130 degree C

* Engine: Model No. 3306-B D1
* Fuel: Diesel

==========================================
2) Caterpillar SR4 400KVA Generator
==========================================

* 400 KVA (370 KW) rated capacity
* 3 phase
* Powered by 6 cylinder CAT V-type engine

* Fuel: Diesel

==========================================
3) Caterpillar SR4 438KVA Generator
==========================================

* Hours: 1936

* Model: SR - 4
* 438 kva
* 350 kw
* cosO 0.8 standby 60 hz
* 3 phase
* 10 wires, Y connected, series connection
* 480 volts, 526 amp.
* excitation 37 volts, 7.7 amp.
* frame 450 rev. 1800/min.
* temp. rise 130 degree C

* Engine: Model 3406-B D1
* Fuel: Diesel

==========================================
4) Caterpillar SR4 462KVA Generator
==========================================

* 400 KVA (370 KW) rated capacity
* 3 phase
* Powered by 6 cylinder CAT V-type engine

* Fuel: Diesel

==========================================
5) Caterpillar SR4 1000KVA Generator
==========================================

* Model: SR - 4
* Rating of 1000 kva/800 kw, 0.8 p.f
* standby of 3 phase
* 10 wires, WYE connected, parallel connection
* 240 volts, 2406 amp.
* excitation of 28 volts
* 8.1 amp.
* 681 frame
* 1800 rpm
* 130 degree C max temp. rise
* Dimensions of 2,400 mm (H)

* Engine: Model No. 3508 Series
* Fuel: Diesel

==========================================
6) Detroit Diesel 375KVA Generator
==========================================

* 375 KVA, 300 KW Y 480/240 Volt
* 3-Phase 60 Hz
* 1800 RPM

==========================================
7) 2x Detroit Diesel 1000KVA Generator
==========================================

* Hours: 8053

* 1000 KVA, 800 KW Y 380V/220V, 1620 Amp
* 3-Phase 60 Hz.
* 1800 RPM

==========================================
8) Detroit Diesel 1625KVA Generator
==========================================

* Hours: 1598

* 1625 KVA, 1200 KW, Y 380V/220V, 2469 Amp.,3-Phase 60 Hz., 1800 RPM

* Fuel: Diesel
* With Cooling Tower

==========================================
9) Detroit Diesel 1625KVA Generator
==========================================

* Hours: 1164

* 1625 KVA, 1300 KW
* 80% PF
* Y 380/240V, 2469 Amp
* 3-Phase 60 Hz.
* 1800 RPM

* Fuel: Diesel
* With Cooling Tower

==========================================
10) 1988 Mitsubishi Seg825 750KVA Generator
==========================================

*Hours: 2406
*Model: SEG825, 750KVA, 3 Phase, 440/254 Volts, 1023/923 Amps
*4 Poles, 1800 RPM, 60 Hz, 0.8. PF
*95/90 excitation volts, 88/82 field amps
*40 degrees C coolant temp., F insulation
*40 V Brushless excitation, 35 V exciter
*11/10 field amp

* Engine: Model Seg825
* Fuel: Diesel

==========================================
11) 1989 Mitsubishi Seg1040 - 1040KVASynchronous Generator
==========================================

* Hours: 1867

* Seg 1040 model
* 3 phase, NTAKL type
* 1040 kva/938 kva output
* 460/265 volts
* 1305/1177 amp.
* 4 poles, 1800 rpm, 60 hz, 0.8 p.f, 35 V/35 V excitation
volts,
* 325 A / 300 A field amp.
* 40 degree C coolant temp.
* F insulation class
* 40 V brushless excitation
* 135 A/12.3 A field amp.
* 35 exciter volt
* Dimensions of 4,670 mm (L) x 2,500 mm (H) x 1,830 mm (W)

* Engine: Model S12A-PTA
* Fuel: Diesel

==========================================
12) 3x Mitsubishi MGS1500 1890KVA Generator
==========================================

* 1890 KVA / 1512 KW
* Continuous 1836 KVA / 1469 KW 60 Hz
* 480/227 Volts
* 2273 Amp

* Fuel: Diesel

==========================================
13) High Voltage Switch Gear
==========================================

* Incoming 34.5 KV, 3 phase, 3 wire, 60 HZ

==========================================
14) 3x Transformers
==========================================

* Serial No.: 3269
* 560 KV, Voltage: HV
* 48"x40"x24"

* Serial No.: 0920
* 250 KVA, Voltage: HV 440
* 48"x31"x22"

* Serial No.: 9404
* 200 KVA, Voltage: HV
* 40"x39"x39"

==========================================
15) 2x Chillers
==========================================

Wednesday, September 9, 2009

Mining Equipment for Sale: Three (3) Units of Caterpillar 988H Loaders












Mining Equipment for Sale: 3x CATERPILLAR 988H LOADERS


















Heavy Equipment for Sale: Complete Used Telsmith Rock Crushing and Wet Screening Plant



COMPLETE USED TELSMITH ROCK CRUSHING and WET SCREENING PLANT

1x 2005 Telsmith Model 20" x 36" Roller Bearing Jaw Crusher

  • With V-belt drive
  • Manganese Jaw dies
  • Hand hydraulic adjustnents for changing crusher setting
  • Wedge lock mechanism controls for locking and unlocking grease lube system
  • 100 HP motor and magnetic reduced voltage auto-transformer starter for 3/60/440 volts.

1x Telsmith Model 48S Gyrasphere Cone Crusher

1x Telsmith Model 24" x 24' Single Screw Classifier

1x set Telsmith model 6' x 16' Four deck Inclined Vibrating Screen

This plant was intermittently used for only about (2) years and is still in very good condition.

Thursday, August 20, 2009

Used Construction Equipment for Sale: France's Eco-Motorway

Used Construction Equipment for Sale: France's first eco-motorway and biggest road infrastructure project to date has been finished following 4 million man hours put in by more than 8000 workers.

The 101km A19 Artenay-Courtenay was completed this week, four months ahead of schedule.

Linking the A10, A6 and A77, it will complete the outer bypass of the greater Paris region.

It is the country's most eco-friendly road thanks to steps taken to prevent any water running off the motorway without being treated first.

To achieve this, the road has 107 run-off treatment basins as well as animal crossings and lots of trees to suck up that carbon dioxide.

Apart from its environmental credentials, the project is also being praised for its record fast completion.
It took just four years to get it up and running from the signing of the concession contract, which concessionaire Arcour claims shows how effective its operator-designer-builder business model is.

Wednesday, August 19, 2009

Heavy Equipment for Sale: San Bernardo project located in the Alamos Mining district of Sonora, Mexico

Heavy Equipment for Sale: A spokesperson announced that following the successful identification of several significant anomalous zones on Canadian Mining’s San Bernardo project located in the Alamos Mining district of Sonora, Mexico the Company is now negotiating to initiate the drill exploration program as recommended by SJ Geophysics’ June 2009 report. The details and terms will be announced when finalized. According to MSloane Consulting, it is ready to supply heavy equipment for sale for its copper mining operations.

In other news, Canadian Mining’s US subsidiary (Canadian Mining of Arizona Inc.) completed a NI 43-101 report on the Company’s 4000 acre Bullard Pass gold project. The report identified 3 large anomalous areas. The Company’s US qualified person Dr. Pat O’Hara has recommended a 5000′ drill program to determine the depth of mineralization. Canadian Mining aims to discover large tonnage gold deposits along upper plate structures or at intersections between these structures using the detachment fault mineralization model. Dr. O’Hara will begin the permitting and bidding process for the drill program in September 2009.

Tuesday, August 18, 2009

Construction Equipment: Komatsu WB156-5 and the WB156PS-5

Construction Equipment: Komatsu America Corp.’s WB156-5 and the WB156PS-5 are equipped with Tier II engines and feature operating weights between 16,530 and 18,780 lbs. (7,498 and 8,518 kg) and loader bucket options up to 1.50 cu. yd. (1.1 cu m). These models are the big brothers of the WB146-5 and WB146PS-5.

MSloane Consulting provides construction equipment for sale for various construction companies worldwide.

The loaders feature a spacious operator station to provide maximum comfort for any size operator. They are available in either open ROPS canopy or enclosed dual entry cab, which allows for easy access from either side of the machine. The climate-controlled cab has 10 vents for maximum air circulation and its curved shape and large windows provide the operator with 360 degree visibility. A one piece, floor-to-ceiling rear-opening window provides outstanding backhoe visibility.

Monday, August 17, 2009

Mining Equipment: Topia Silver-Zinc Mine

Mining Equipment: The Topia silver-zinc mine is situated in the west-central Durango State of Mexico. The area covers four blocks of mineral exploitation concessions over 6,344ha. Minera Mexicana EI Rosario, a subsidiary of Great Panther, owns 100% of the concessions.

MSloane Consulting provides mining equipment for various mining companies worldwide.

The Recompensa vein was reopened in January 2009 under new mining contracts. It contributed to first quarter results when high records were set for silver and ore grade.

The Topia mine targets clean mining of high-grade narrow veins with reuse mining. The exploratory development is limited to known areas where there is strong potential for wider and higher grade veins.

The Topia mining district is among the oldest in Mexico. Most of the mine’s veins lie on the Great Panther property.

Friday, August 14, 2009

Used Mining Equipment for Sale: Twangiza Banro Gold Project

Used Mining Equipment for Sale: Banro Corporation announce that it has entered into an agreement to purchase a refurbished gold processing plant capable of achieving a throughput capacity of 1.3 million tonnes per annum. MSloane Consulting provides heavy equipment for sale for various construction and mining companies worldwide.The closing of the purchase of the plant is expected to occur on or about September 21, 2009.

This acquisition supports the Company’s strategy of advancing production through a staged approach which will focus initially on the processing of oxide material at the Company’s wholly-owned Twangiza gold project in the Democratic Republic of the Congo (the “DRC”).

It is planned that the plant will be transported by sea from Australia, via the Mombasa port in Kenya, and then by road to the Twangiza project site in the DRC, where it will be erected and commissioned over the next 24 months. The Company intends to further optimize this timeline as the project moves forward.

Thursday, August 13, 2009

Used Construction Equipment for Sale: Tornado Tower, Doha, Qatar

Used Construction Equipment for Sale: This striking tower that allows for interesting exterior lighting is located in Doha, Qatar. MSloane Consulting, it is ready to supply used construction equipment for sale for any construction projects around the world.

Architects CICO Consulting Architects and Engineers / SIAT Architekten + Ingenieure Munchen GmbH built a lightweight structure that allows for flexible floor plans and efficiencies in construction, economics and energy.

For Sale: Foremost MPD 1500 Tracked Tiltable Platform Reverse Circulation Rig

Foremost MPD 1500 Tracked Tiltable Platform Reverse Circulation Rig
  • Located in Nevada, U.S.A
  • With 90,000 lb pullback.
  • 10,000 hrs but has completely overhauled in 2006 and has been in dry storage since.
  • Comes with a very comprehensive spares package including many engine, compressor, new drill bits and 2 new hammers etc.
  • Top head was over hauled and all new seals ready to go to work.
  • Comes with very good condition low loader with removable goose neck, also with spares, wheel tyres, hydraulic pipes, etc.
  • Also included is 900 ft of double walled drill pipe.
  • As is, where is.
Thank you.

Wednesday, August 12, 2009

Heavy Equipment for Sale: Antapaccay and La Bambas Copper Project

Heavy Equipment for Sale: Production at the Antapaccay copper project in Peru is set to start by the end of 2012 or the beginning of 2013, while Las Bambas should be operational by the close of 2014 according to mining giant Xstrata. According to MSloane Consulting, it is ready to supply heavy equipment for sale for its copper mining operations.

Annual copper output from Peru will increase to 500 000 tonnes by 2014, not including contributions from Antamina, Xstrata announced.

The bulk of its projected production would come from Las Bambas, which Xstrata recently said has a mineral resource of 1,13-billion tons with a copper grade of 0,77%.

The new estimate, published earlier this month, represents a 26% jump from the company's last forecast.

The Antapaccay project has resources of 720-million tons with a copper grade of 0,56%, the company said, which is a 38% increase from its previous estimate.

Feasibility studies on both projects are expected by the end of this year.

Monday, August 10, 2009

Mining Equipment: The Kermadec SMS deposits in New Zealand

Mining Equipment: One of the key seafloor massive sulphide (SMS) projects of Neptune Minerals, is Kermadec, based in the northern waters of New Zealand. MSloane Consulting provides mining equipment for mineral explorers and developers, while Neptune Minerals is into exploring and developing precious and base metal SMS deposits. SMS is a high grade hydrothermal deposit containing high levels of copper, zinc and lead along with high gold and silver content.

Neptune Minerals has been granted exploration licences for an aggregate of 261,146km² in the territorial waters of New Zealand and Papua New Guinea. It also has licences in the Federated States of Micronesia and Vanuatu.

Neptune, along with Canyon Offshore, Century Subsea and Seacore, undertook coring and sea-floor mapping in the company’s granted prospecting licence (Kermadec PL 39-195), within New Zealand’s 200 nautical mile Exclusive Economic Zone.

Friday, August 7, 2009

Used Mining Equipment for Sale: Russian Technologies to Make $3-billion Investment in their Untapped Copper Field

Used Mining Equipment for Sale: Russian Technologies, a state-owned conglomerate, and its partners are planning to invest $3-billion for used mining equipment for sale and other operation requirements to develop Russia's largest untapped copper field in the next two to three years and are seeking loans from state and foreign banks.

MSloane Consulting provides heavy equipment for sale for various construction and mining companies worldwide.

Head of Russian Technologies, Sergei Chemezov, said on Thursday that the partners in the Udokan copper project were in talks with state-owned banks VEB and VTB and did not rule out borrowing from foreign banks to develop the Siberian copper field.

"I think we will be finished in two to three years," Chemezov told reporters in the Turkish capital, Ankara, during a visit by Russian Prime Minister Vladimir Putin.

He said the partners in Udokan, including iron and steel firm Metalloinvest, would finance some of the investment in construction, preparation and exploration at Udokan, located in the Zabaikalsky region of Siberia.




Thursday, August 6, 2009

Used Mining Equipment for Sale: Linked Hybrid, Beijing, China

Used Mining Equipment for Sale: This 220,000 sq m project features 750 apartments, green space, commercial zones, entertainment and education facilities. But what makes it really special is how architect Steven Holl has managed to achieve a porous flow through the building with linked walkways, multifaceted layers and open passages. Its use of colour is admirable and adds to the buzzing feeling of this development.

Tuesday, August 4, 2009

Construction Equipment: Manitoba Hydro Place

Construction Equipment: Manitoba Hydro Place in Winnipeg, Canada is 115m tall by Kuwabara Payne McKenna Blumberg Architects/Smith Carter Architects and Engineers. It was recognised for being completely site specific as data on wind, sun and temperature at the site was analysed to produce a sustainable tower that uses 60% less energy than a regular office block.

Monday, August 3, 2009

Mining Equipment: One Billion Ton Iron-ore Resource in Liberia

Mining Equipment: TSX Venture Exchange- and Aim-listed Mano River on Monday announced an initial independent mineral resource estimate of 1,08-billion tons of iron-ore at its 38,5%-owned project in Liberia.

Russian steelmaker Severstal’s mining subsidiary owns the majority stake of 61,5% in the Putu Range project, in which it had invested $30-million.

The Putu resource had potential to grow as its exploration programme advanced, Mano president and CEO Luis da Silva reported.

Friday, July 31, 2009

Used Mining Equipment for Sale: Copper Hits a Ten-month High

Mining equipment for sale: Copper hit a ten-month high on Monday as fresh data suggested the global recession was easing, spurring hopes of a recovery in demand and sending the dollar lower.

Brokerage CLSA's China purchasing managers index rose to a one-year high of 52,8 in July, confirming official PMI data over the weekend that indicated an expansion in manufacturing, while US gross domestic product numbers on Friday showed the world's largest economy shrank by less than expected in the second quarter.

The greenback sank to its lowest point this year against a basket of currencies, making dollar-priced commodities cheaper for holders of other currencies.

"The markets are certainly factoring in economic recovery and that's a key reason why we've had these big gains in commodity prices," said David Moore, commodity strategist at Commonwealth Bank of Australia.

Thursday, July 30, 2009

Used Construction Equipment: Developments at One WTC

Used Construction Equipment: Construction at New York’s World Trade Center (WTC) site has met most of the milestones that were set last year keep the project on track, the Port Authority of New York and New Jersey (PANYNJ) said.

MSloane Consulting provides used construction equipment to help projects swiftly go through the used construction equipment acquisition stage and meet target deadlines for milestones.

PANYNJ detailed its achievements in its first quarterly report on progress at the site after new targets were set in October 2008 to try and keep the scheme on track.

Despite meeting eight of the nine major milestones for quarter 4 in 2008 PANYNJ and Silverstein Properties missed its deadline for excavations at the sites of Tower 2 and Tower 4.

Those milestones that have been met include installing 1,600t of steel for the National September 11 Memorial & Museum, completing the foundation for One WTC - the Freedom Tower - and beginning procurement of 22,000t of steel needed for the WTC Transportation Hub.

Wednesday, July 29, 2009

Heavy Equipment for Sale: Centerra Gold's Boroo Mine

Heavy Equipment for Sale: Minerals Resources Authority of Mongolia issued a decree reinstating the Boroo Mine’s main operating licenses for Centerra Gold Inc. The decree cancels the earlier suspension order received by the Company last June 12, 2009. The Company expects that the Boroo mine will resume full mining and milling operations in the next few days. The Company is continuing its discussions with Mongolian regulatory authorities regarding the circumstances of the suspension.

Tuesday, July 28, 2009

Construction Equipment for Sale in UAE - Dubai, The Impossible City

Construction Equipment for Sale: Komatsu D575 Bulldozer



This is the largest bulldozer in the world. And it is located at a place where big, tall and impossible engineering feats can be found. UAE.



For more information on construction equipment for sale on UAE, visit MSloane Consulting.

Monday, July 27, 2009

A New Breed of Mining Equipment

It seems inevitable that unmanned aerial vehicles (UAV), which have already risen to prominence in the military sector, will become standard mining equipment in the mining business.

Research in UAVs has been increasing since the last decade. Initially the applications have been focused on the military.

This, however, is changing and the vast benefits of the technology have attracted the attention of industries such as the mining equipment sector which has already begun to reap the rewards.

The primary use of aircraft within the mining industry is for exploration; to map out tracts of distant terrain and to explore for potential mineral deposits. The nature of such missions makes the use of UAVs a natural fit, but that is not the only area of mining operations in which unmanned aircraft excel.

Missions flown by manned fixed-wing aircraft are inherently dangerous because of the necessity of conducting such flights at low altitudes and low air speeds. UAVs only require control from a pilot stationed safely on the ground.

Friday, July 24, 2009

Used Mining Equipment for Sale: Iberian Minerals Corp.

Used Mining Equipment for Sale: Iberian Minerals Corp. announced today that the Company, through its wholly-owned subsidiary Minas de Aguas Tenidas S.A.U. (”MATSA”) has entered into an agreement with INGENIERIA DE SUELOS Y EXPLOTACION DE RECUROS S.A (”Insersa”) whereby MATSA will purchase the Aguas Tenidas underground mining division of Insersa for the sum of Euros 6,000,000, payable as to Euros 5,520,000 in cash and Euros 480,000 in common shares of Iberian.

The cash portion of the consideration will be paid as to 30% (Euros 1,656,000) on closing, 30% (Euros 1,656,000) six months after closing, and the remaining balance of 40% (Euros 2,208,000) in one year. All future payments are without interest.

Thursday, July 23, 2009

Used Construction Equipment: Larget Bulldozer in the World for Sale in Dubai, U.A.E.

For middle east contractors, here is the world's largest bulldozer. Only about 5 of these were made. This used construction equipment is for sale.

1998 Komatsu D575A-2 Bulldozer
  • Power: 1150 HP

  • Weight: 140 Tons

  • Hours: Less than 8,000

  • Location: United Arab Emirates

  • Asking Price: 820,000 USD (negotiable)
    Seller will also consider lease-buy option with approved credit.

  • Accessories & Attachments:
    8m x 4m blade, 4-bbl MS ripper, A/C ROPS cab, 885mm tracks

  • Comments:
    This is the largest, most productive bulldozer in the world. It is American owned, in perfect condition and well maintained in the U.S. Full maintenance history is available. U/C is 85%. The blade never used, only the rippers.


Wednesday, July 22, 2009

Heavy Equipment for Sale: Kalsaka Gold Mine

Heavy Equipment for Sale: West African Cluff Gold plc, the focused gold mining company announced that as of July 2009, the operations at the Kalsaka Gold Mine have reached the required standard at which successful commissioning has been achieved.

MSloane Consulting provides heavy equipment for sale for various construction and mining companies worldwide.

Gold was first poured at the Kalsaka Gold Mine in October, 2008 and since that time performance has incrementally increased each month.

Total gold production for the first 6 months of 2009 amounted to 26,772 ounces at a cash operating cost of US$595 per ounce (US$632 per ounce including royalty and refining charges). Forecast production for the full year is 60,000 ounces.

Tuesday, July 21, 2009

Construction Equipment: China State Construction Engineering Corp. Raises $7.3 Billion

Construction equipment: MSloane Consulting learned that China State Construction Engineering Corp. is China's largest housing contractor and will sell as many as 12 billion shares at 3.96 yuan to 4.18 yuan each. The sale of a 40 percent stake brings the value of State Construction at as much as 125.5 billion yuan.

China State Construction Engineering Corp. is raising 50.2 billion yuan ($7.3 billion) in the world’s biggest initial public offering since 2008.

State Construction’s IPO is almost 28 times larger than the second-biggest sale in mainland China this year, testing a rally that’s pushed the benchmark Shanghai Composite 80 percent higher since Dec. 31. The company, led by Chairman Sun Wenjie, plans to use proceeds to expand in residential construction, as a surge in bank lending drives a pickup in the housing market.

Monday, July 20, 2009

Mining Equipment and $16.6M Rough Diamonds Sold

With mining equipment, Trans Hex, South African diamond producer produced about $16,6-million by selling 17 075 ct at the group’s July tender sale, it reported. MSloane Consulting on the other hand helps mining companies increase output with efficient mining equipment.

Trans Hex achieved an average price of $973/ct, which the company said reflected the upward rise in rough diamond prices since March.

In total, 86 stones in excess of ten carats were sold with 13 stones in excess of 20 ct and two stones in excess of 50 ct in weight.

Friday, July 17, 2009

Used Mining Equipment for Sale: The Pujada Nickel Mine in Davao Oriental, Philippines

Used Mining Equipment for Sale: The Pujada nickel mine is an open pit deposit spread across 11,799ha and commercial production is expected to begin during 2009-10. MSloane Consulting provides used mining equipment for sale across the country and across the globe.

It is located in the municipalities of Mati, San Isidro and Governor Generoso in the province of Davao Oriental in the Philippines. The mine is owned by BHP Billiton in partnership with Queensland Nickel. The mine will create around 2,700 jobs.

Current tenement holders of the project include Hallmark Mining/Austral-Asia Link Mining. Mineral production sharing agreements to the project were assigned in the name of Hopewell Mining, St Patrick Mining and Development, Hallmark Mining, PL Goodman Mining and Development and Blue Ridge Mineral. Other tenement holders of the mine include Oregon Mining and Development, Galactica Mining and Development and Mount Peak Mining and Development.

Thursday, July 16, 2009

Used Construction Equipment: South Carolina Highway Upgrade

A dangerous stretch of South Carolina highway is now going to be upgraded with used construction equipment. MSloane Consulting provides used construction equipment that are more economical to purchase especially during this time of economic recession. Making the U.S. 17/ACE Basin Parkway highway safe for motorists, while giving residents and vacationers a faster way of escaping an approaching hurricane, is the goal of a $100 million road project near the state’s southernmost tip.

Eight miles (12.8 km) of the U.S. 17/ACE Basin Parkway, a stretch of the federal highway just north of Beaufort, is currently undergoing an expansion from a treacherous two-lane road to a median-divided four-lane highway (a smaller segment of the highway will even include a fifth lane).

Wednesday, July 15, 2009

Heavy Equipment for Sale: Drilling Campaign on San Miguel Project in Mexico

Heavy Equipment for Sale: Paramount Gold and Silver Corp. announce that the drilling campaign on the San Miguel project was restarted which would be good for heavy equipment for sale to be back in action. This drilling program will be conducted in 2 distinct stages, target testing and follow-up resource delineation. Exploration drilling is focusing on the gold-rich parts of the San Miguel mineral system with the goal of defining 2 million gold ounces within the next 12 months. It is anticipated that a significant silver credit would accompany successfully attaining this goal. The initial target testing stage is utilizing 1 diamond core drill contracted from Layne de Mexico S.A. de C.V.

Tuesday, July 14, 2009

Construction Equipment: Accelerated Bridge Project in Massachusets

Contractors, subcontractors and construction equipment providers around Massachusetts may hope for multiple state highway and bridge projects as the Governor’s Accelerated Bridge Project (ABP) is now coming through. MSloane Consulting provides used construction equipment that are more economical to purchase especially during this time of economic recession.

There will be work for companies of all sizes. There will be jobs of all sizes for construction contractors. "The jobs range from the $300 million Longfellow Bridge to much smaller bridge preservation jobs, ranging in the hundreds of thousands dollars,” said Mass Highway Commissioner Luisa Paiewonsky. They are expecting an array and many types of companies that will be bidding on the work.

A total of 30 projects are ready for construction or under way as part of Gov. Deval Patrick’s Accelerated Bridge Program to reduce the Commonwealth’s backlog of structurally deficient bridges

Monday, July 13, 2009

Mining Equipment for an Oil Prospect in Louisiana by U.S. Energy Corp.

Mining Equipment: U.S. Energy Corp., an exploration and mining company with molybdenum, oil and gas, geothermal projects projects, and real estate assets, announced that it has entered into a third Participation Agreement with Houston, Texas-based Houston Energy L.P. MSloane Consulting, on the other hand, provides mining and construction equipment for various mining and construction companies worldwide. Houston Energy L.P. will acquire a 25% working interest in an oil prospect located in southeast Louisiana. Houston Energy estimates the prospect has a potential reserve of 2.1 million barrels of oil.

Friday, July 10, 2009

Used Mining Equipment for Sale

Used mining equipment for sale targeted to Uranium One which has two operating mines in Kazakhstan. The Akdala mine, in which the company holds 70%, continues to produce in line with expectations, Uranium One said. The firm also holds 70% of the South Inkai mine, which declared commercial production on January this year and continues to ramp up output as planned.

By the end of the second quarter, 134 of the 343 wells scheduled to be installed this year at South Inkai had been installed, and the operation remains on track to commission the drying circuit by year end.

MSloane Consulting helps mining companies cut operational costs through the purchase of high-performing used mining equipment for sale.

The circuit will help Uranium One cut operational costs, because the company expects Akdala will be also able to use excess drying capacity at South Inkai, which will reduce the need to use third-party processing facilities for drying and calcining.

Thursday, July 9, 2009

EQUIPMENT WANTED: Dump Trucks, Dozers, Excavators and Backhoe from Japan

We're looking for brand new heavy equipment from Japan. This is an urgent requirement.

10 units 10 wheeler dump trucks
5 units dozers
5 units backhoe
5 units excavators

Please respond with specifications, photo/s, location and price.

Please contact us info@msloaneconsulting.com or visit our Website: http://www.msloaneconsulting.com

Thank you.

Used Construction Equipment: for 2.7km Forth Replacement Crossing

Used construction equipment eyes four major contractors: Morgan Est, BAM Nuttall, Balfour Beatty and VINCI Construction Grands Projects, confirmed they will work as an integrated joint venture to participate in the procurement of Transport Scotland’s £1.7 to £2.3 billion Forth Replacement Crossing.

They have joined together as Forthspan to address the demands of this major project which is vital to Scotland’s economy. MSloane Consulting is set to provide high-performing used construction equipment when called for this project.

Forthspan is a strong Scottish-based group that has been formed to prequalify and bid for the UK’s most significant new bridge in 20 years. All four businesses have a solid record of delivering major infrastructure schemes in Scotland and throughout the world and now jointly will provide the full range of skills, resources and technical expertise required for such a large scale project. They will be supported by a world class design team including Halcrow Group, Cowi A/S, (incorporating Flint and Neill partnership) and WA Fairhurst and Partners.

Funded by Transport Scotland, the 2.7km Forth Replacement Crossing will be located to the west of the existing Forth Road Bridge and will provide a new high quality dual carriageway crossing of the Firth of Forth along with associated approach roads, junction improvements and an intelligent transport control system.