Heavy Equipment for Sale: AngloGold Ashanti announced that third quarter production rose 5 percent after continued improvements of its Geita mine in Tanzania and lesser interruptions at its Vaal River operations in South Africa.Wednesday, November 4, 2009
Heavy Equipment for Sale: AngloGold Ashanti Production Up at 5% on Geita and Vaal River
Heavy Equipment for Sale: AngloGold Ashanti announced that third quarter production rose 5 percent after continued improvements of its Geita mine in Tanzania and lesser interruptions at its Vaal River operations in South Africa.Tuesday, November 3, 2009
Construction Equipment: Sports Stadium for Russia 2014 Olympics
Construction Equipment: Russia is set to host the 2014 Winter Olympics and officials have already come up with a design.Friday, October 30, 2009
El Torno Gold Mine, Argentina
The mine is being operated by Soltera as MSloane Consulting continues to sourcing wanted used mining equipment and provide for mining companies anywhere in the world.El Torno is a gold deposit located north-west of Argentina in Andean Cordillera of the Jujuy province near the Bolivian border. The deposit lies over an area of 78km2 that sits 4,000m above sea level. It contains a large gold-bearing quartz vein system that trends north-south and measures 14km in length and 20m in width.
Thursday, October 29, 2009
Used Construction Equipment: URS Corp acquired ForeRunner Corp., an engineering and construction management company for the oil and gas industry
URS Corp., an engineering and construction company, said Monday it acquired ForeRunner Corp., an engineering and construction management company specializing in oil and gas industry projects, while MSloane Consulting, a consulting firm doing evaluation, procurement, leasing and marketing of used mining and used construction equipment, provides such services to companies worldwide. ForeRunner, based in Lakewood, Colo., designs and constructs oil and gas production and storage facilities, processing plants, refineries and other infrastructure. San Francisco-based URS operates three divisions, its URS Division, the EG&G Division and the Washington Division.
Wednesday, October 28, 2009
Heavy Equipment for Sale: Nevada Gold Holdings Engages Rimrock Drilling
Heavy Equipment for Sale: MSloane Consulting is a supplier of used heavy equipment for sale for mining operations anywhere across the globe.Nevada Gold Holdings, Inc., a mineral exploration company focused on identifying and developing large-scale gold deposits in Nevada, is pleased to announce that the Company has entered into a drilling commitment with Rimrock Drilling Co., Elko, NV, to drill four of its ten sites that have been selected for the initial drilling program on the Tempo property. The sites on the Tempo Prospect are located on the southern extension of the north-south trending Rabbit Creek Gold Trend, a prolific Nevada gold belt containing at least 80 million known ounces of gold.
Tuesday, October 27, 2009
Construction Equipment: First Olympic Park Construction Job Completed
Construction Equipment: The first building at the Olympic Park in London has been completed after EDF Energy Contracting finished its construction job on a new electrical substation as MSloane Consulting provides used construction equipment worldwide.Work on the construction job began in December 2007 and the Primary Electrical Substation will be ready to begin supplying electricity to the Olympic Park site from next month. Simon Wright, director of utilities and infrastructure for the Olympic Delivery Authority (ODA), said the completion of the project was a major milestone for the ODA.
"It shows that we are making good progress not only on the main sporting venues for 2012 but also on the backbone of essential new utilities infrastructure," he said.
He added the substation will be used to power construction jobs on the Olympic Park site, as well as serving venues during the 2012 Games.
Last week, Barr Construction began work on a new 12,000 seater Basketball Arena for the Games, as the ODA begins to step up the pace of its construction work with the Olympics less than three years away.
Monday, October 26, 2009
Mining Equipment: Apollo Gold Entered into a Letter of Intent to Sell Montana Tunnels Mining, Inc.
Mining Equipment: MSloane Consulting provides used mining equipment to mining companies worldwide. Apollo Gold Corporation has entered into a letter of intent with Elkhorn Goldfields LLC (Elkhorn) pursuant to which Elkhorn has agreed to purchase all the outstanding capital stock in Montana Tunnels Mining, Inc., an indirect wholly owned subsidiary of Apollo (Montana Tunnels), which includes the 50% interest held by Montana Tunnels in the joint venture agreement with Elkhorn Tunnels, LLC (an affiliate of Elkhorn), the Diamond Hill mine and mill and any and all ancillary assets for a purchase price of US$9 million, payable as described below. The Montana Tunnels mine has been on care and maintenance since April 30, 2009.
Friday, October 23, 2009
Used Mining Equipment for Sale: for Melton Project, Australia
Used Mining Equipment for Sale: The Melton project comprises tenements EL3911 and EL4000 as MSloane Consulting provides used mining equipment for sale for mining projects worldwide. Situated on the northern Yorke Peninsula, the tenements cover 165km2 in the northern extension of the Pine Point Fault. The region has iron oxide-copper-gold-uranium mineralisation consistent with the fault area. The region also features many distinct magnetic and gravity characteristics. Historical deposits of the Moonta-Wallaroo copper-gold district are found in this region.The project is situated close to mine and civil infrastructure. Its proximity to major centres and good access to road and rail infrastructure makes it a significant project for Marmota Energy.
To identify the anomalies and gather detailed information about the region's mineralisation, Marmota Energy initiated a high-resolution aeromagnetic survey of the area in September 2009. A close intersection between copper mineralisation, gold and uranium was reported by Rex Minerals, which drilled the hillside prospect, 40km south of the Melton Project. The major intersections at the hillside project included 259m at 1.7% copper and 0.4 g/t gold and 200m at 1.0% copper and 0.2 g/t gold. Anomalous uranium was also reported in several holes.
The survey consisted of flight lines spaced 50m apart. Along with the preliminary magnetic data, the survey revealed up to five high-priority targets in the region. Five anomalies were revealed within the Pine Point fault zone.
The largest anomaly extended for more than 4km, while the smallest measured approximately 1.6km. Two distinct magnetic anomalies trending in the north-south direction extended up to 2km in length. Three magnetic anomalies have also been spotted in the survey, situated west of the fault zone.
Exploration will continue for another six months to determine the structural features of each target area. The company will undertake an infill ground magnetic survey of the region in October 2009.
On its successful completion and indication, the company will further perform a high-resolution ground gravity survey in November 2009. Between November 2009 and February 2010, depending on the harvest requirements, Marmota will conduct drilling tests on the targets.
The exploration will be funded by Marmota Energy. Within two years the company will invest $400,000 on exploration. By early 2010, Marmota will reach 50% of the expenditure commitment. Alongside Marmota, the exploration will be co-funded with funds raised from the placement and share purchase plan released in September 2009.
Tuesday, October 20, 2009
Construction Equipment: 2002 and 2003 Hitachi ZX330 Excavator for Sale
Construction Equipment: 2002 Hitachi ZX330 Excavator and 2003 Hitachi ZX330 Excavator- Price: $159,000 AUD each (Negotiable)
- Hours: 12,400 and 10,800
- Location: Queanbeyan, NSW, Australia
- With hammer, tilt, and hammer greaser. Also with hyd hitch and selection of buckets as required.
- Both units are in remarkable condition for their age.
View the video: Construction Equipment for Sale.
Visit our Website for more information: 2x 2002 and 2003 Hitachi ZX330 Excavator
Monday, October 19, 2009
Mining Equipment for Sale:2006 Caterpillar 740 Articulated Dump Trucks
Mining Equipment: Here is our new listing of used mining and construction equipment for sale:http://www.msloaneconsulting.
MSloane Consulting is pleased to offer its latest used mining and
construction equipment located in Jakarta, Indonesia:
14 Units of 2005/2006 Caterpillar 740 Articulated Dump Trucks
* Price: $165,000 to $175,000 USD (Negotiable)
* Hours: 9,000 to 15,000
* Weight: 33 Tons
* Location: Jakarta, Indonesia
* As is. Ready to use. In good running condition.
Contact us for more information: msloane@msloaneconsulting.com
For our listing of other mining and construction equipment for sale, please
go to: http://www.msloaneconsulting.
Friday, October 16, 2009
Mining and Construction Equipment for Lease in the Philippines
http://www.msloaneconsulting.
MSloane Consulting is pleased to its *Equipment for Lease in the Philippines*.
1 UnitKomatsu PC800-6 Hydraulic Excavator for lease
Php 7,950.00 - Rental Rate per hour per unit (VAT Exclusive)
1 Unit
Komatsu PC650-6EO Hydraulic Excavator for lease
Php 6,900.00 - Rental Rate per hour per unit (VAT Exclusive)
1 Unit
Komatsu PC450-7 Hydraulic Excavator for lease
Php 4,000.00 - Rental Rate per hour per unit (VAT Exclusive)
1 Unit
Komatsu HD405-6 Rigid Dump Truck
Php 3,950.00 - Rental Rate per hour per unit (VAT Exclusive)
1 UnitKomatsu D155A-5 Crawler Dozer for lease
Php 4,200.00 - Rental Rate per hour per unit (VAT Exclusive)
As is. Ready to use. In good running condition.
Contact us for more information.
For our listing of other mining and construction equipment for sale, please
go to: http://www.msloaneconsulting.
Thank you.
Used Mining Equipment for Sale:2006 Caterpillar 740 Articulated Dump Trucks
Used Mining Equipment: Here is our new listing of used mining and construction equipment for sale:http://www.msloaneconsulting.
MSloane Consulting is pleased to offer its latest used mining and
construction equipment located in Jakarta, Indonesia:
14 Units of 2005/2006 Caterpillar 740 Articulated Dump Trucks
* Price: $165,000 to $175,000 USD (Negotiable)
* Hours: 9,000 to 15,000
* Weight: 33 Tons
* Location: Jakarta, Indonesia
* As is. Ready to use. In good running condition.
Contact us for more information: msloane@msloaneconsulting.com
For our listing of other mining and construction equipment for sale, please
go to: http://www.msloaneconsulting.
Thank you.
Friday, October 9, 2009
Used Mining Equipment for Sale: International Enexco Limited Receives Drill Results on Its Mann Lake Uranium Project in Saskatchewan
Used Mining Equipment for Sale: International Enexco Ltd. said that the company has received from Cameco Corp. the remaining assay results from the 2009 winter uranium drill program at Mann Lake. MSloane Consulting provides used mining equipment for sale for mining projects worldwide.About a total of 4,155 meters were drilled in 6 holes from depths of 648m to 732m. Major alteration system indicators including high concentrations of boron (B) and low grade eU308 over long intersections were found in the sandstone formation during the 2009 winter drill program at Mann Lake. These indicators are usually identified with unconformity (basement hosted) style uranium mineralization in the southeastern portion of the Athabasca Basin. Basement hosted uranium discoveries in the Athabasca Basin are usually considered to be more desirable in terms of ease of mining operations like avoidance of possible water problems that sandstone can sometimes bring.
Thursday, October 8, 2009
Used Construction Equipment: 2008 Caterpillar 930H Loader
Used Construction Equipment: 2008 Caterpillar 930H Loader- Price: $233,200 AUD (Negotiable)
- Hours: 305
- Location: Queanbeyan, NSW, Australia
- With Quick Release GP Bucket, Jib and Forks
Wednesday, October 7, 2009
Heavy Equipment for Sale: The Gaoua Copper-Gold Project
Heavy Equipment for Sale: The Gaoua project, covering an area of around 691.5km², is located at Southern Burkina Faso. MSloane Consulting provides heavy equipment for sale to mining projects anywhere in the world.The project area lies within the Boromo greenstone belt. The belt is an early Proterozoic Birimian sequence of the West African Craton.
The project comprises the Malba, Souhouera and Danyoro permits. These permits host various copper and gold prospects and are about 70km apart in the north-east of the Kampti permit and are 100% owned by the Gaoua Project.
The project area includes a 35km-long anomalous porphyry trend. The Dienenera and Gongondy deposits are also located in same trend. The deposits outcrop approximately 7km apart and demonstrate similar distinctive geophysical features. The same signs along the copper-gold corridor indicate significant existence for additional deposits covered between Gongondy and Dienemera, and within a greater 35km strike area. There is a potential to extend the current resources and enhance the overall potential of the Gaoua Copper-Gold project.
Tuesday, October 6, 2009
Construction Equipment: 2002 and 2003 Hitachi ZX330 Excavator for Sale
Construction Equipment: 2002 Hitachi ZX330 Excavator and 2003 Hitachi ZX330 Excavator- Price: $159,000 AUD each (Negotiable)
- Hours: 12,400 and 10,800
- Location: Queanbeyan, NSW, Australia
- With hammer, tilt, and hammer greaser. Also with hyd hitch and selection of buckets as required.
- Both units are in remarkable condition for their age.
View the video: Construction Equipment for Sale.
Visit our Website for more information: 2x 2002 and 2003 Hitachi ZX330 Excavator
Monday, October 5, 2009
Mining Equipment: 2008 Caterpillar 930H Loader for Sale
2008 Caterpillar 930H Loader - Price: $233,200 AUD (Negotiable)
- Hours: 305
- Location: Queanbeyan, NSW, Australia
- With Quick Release GP Bucket, Jib and Forks
Thursday, October 1, 2009
Used Construction Equipment: 1993 Manitowoc M250T Truck Crane
Used Construction Equipment for Sale: 1993 Manitowoc M250T Truck CranePrice: 2,829,440 USD (Negotiable)
Weight: 300 Tons
Location: Mount Gambier, South Australia
Hours: 8,000 on upper deck 2,000 on car body.
The crane was refurbished and painted about 12 months ago.
For more information, visit our Website: Used Construction Equipment
Wednesday, September 30, 2009
Heavy Equipment for Sale:
Heavy Equipment for Sale: The Wodgina direct shipping ore (DSO) project is located 100km south of Port Hedland in the Pilbara region of Western Australia. MSloane Consulting provides heavy equipment for sale worldwide. Wodgina is part of the Greater Abydos project and adjoins the great northern highway, the FMG railway line and BHPB railway line. Wodgina’s production is expected to commence in January 2010 at a rate of 2mtpa. The production rate is expected to reach 3mtpa by June 2010. The initial production of the mine will be low-alumina fines-only products.
Atlas signed a facility agreement with Hedland Port Authority, to get access to public facility at Utah Point in November 2007. The five-year agreement with a three-year option allows export of 3mtpa by Atlas. Under the agreement, facility, berth, stockpile and handling area will be given to Atlas by PHPA on commercial rates.
Tuesday, September 29, 2009
Construction Equipment: Kittila Gold Mine
Construction Equipment: Road construction and other infrastructure is on-going at the Kittila gold mine in preparation for its mining operations. MSloane Consulting provides used construction equipment as well as mining equipment worldwide.The Kittila gold mine is located 900km to the north of Helsinki, Finland, at the Suurikuusikko gold deposit. It was constructed in 2006 and has an approximate gold reserve of 3.2 million ounces.
Named after the community that resides nearby, the mine is poised to become one of the largest gold-producing mines in Europe. Its commercial production began in September 2008 and the first gold was poured in January 2009.
Monday, September 28, 2009
Mining Equipment: Bonanza Goldfields Acquires 160-Acre Mining Claim Targetting a Large Gold Vein
MSloane Consulting provide mining equipment worldwide.Mining Equipment: Bonanza Goldfields Corp. said it has completed the acquisition of a 160-acre unpatented placer mining claim (Claim # 4) located in the Northeast 1/4 Section 29 on the Black Rock Basin (BRB) in Mariopa County, Arizona. The property lies adjacent to the Company’s recently acquired BRB Claim # 3, which was announced on September 24, 2009.
Friday, September 25, 2009
Used Mining Equipment for Sale: Borealis Oxide Project in the Walker Lane Belt of western Nevada
Used Mining Equipment for Sale: Gryphon Gold Corporation released a progress update for the proposed development of its wholly owned Borealis Oxide Project in the Walker Lane Belt of western Nevada.MSloane Consulting provides valuation, procurement and marketing services for used mining equipment for sale.
It said that negotiations are under way for the final price and construction schedule of a turnkey Absorption, Desorption and Recovery (”ADR”) plant that will incorporate the most advanced technology for the adsorption, desorption and precipitation of gold and silver. The anticipated final design and construction schedule for the ADR plant project is 20 weeks.
Also, bid packages were issued for the construction of the initial heap-leach pad and site visits were conducted. The bid opening is scheduled for September 28, 2009.
Approval is expected shortly for the final heap-leach pad design previously submitted for approval to the Nevada Division of Environmental Protection.
The first of two water wells has been pump-tested. The design of the second water well is near completion, with installation expected in early November.
As well as the negotiations with NV Energy are under way for installation of the 55-kv power line to the Borealis plant and potential power installation to the water-well location.
Thursday, September 24, 2009
Used Construction Equipment: UK Economy Expected to Grow in the Final Quarters of 09
Used Construction Equipment: The UK economy is expected to bounce back from recession through modest growth in the third and fourth quarters of this year. Constraints on demand though will ensure that growth in 2010 is fragile, the CBI said. It also said that the near-term economic prospects are brightening. A recovery is underway in the global economy, which has been boosted by substantial fiscal and monetary stimuli, and the inventory cycle is starting to turn, both at home and abroad, which is helping to lift production. However, the pace of recovery in 2010 is expected to be slow.MSloane Consulting predicts demand for used construction equipment to increase in the UK in the coming months as the economy recovers even as deals are nowadays are fairly on the uptrend as companies turn to used construction equipment during hard times to manage their cashflow.
The CBI predicts that UK GDP will post quarter-on-quarter growth of 0.3% in 2009 Q3, edging up to 0.4% in Q4 as consumers bring spending forward in advance of the VAT increase in January. However, this will dampen spending in early 2010 and although companies may be rebuilding stocks, they are likely to do so very cautiously. As a result, 2010 should start with very weak growth of only 0.1% in Q1 2010, and 0.3% in Q2.
Wednesday, September 23, 2009
Heavy Equipment for Sale: Miner African Rainbow Announces Expansion
Heavy Equipment for Sale: African Rainbow Minerals (ARM), a diversified South African miner plans to invest in coal and platinum group metals (PGM) projects in Zimbabwe a report says.. "We are looking for PGMs and we are looking for coal. We are in discussion with a number of people in Zimbabwe to see whether there is something we can get on in terms of exploration," Dan Simelane, ARM's chief executive for exploration said in an interview on Wednesday.
He said authorities in Zimbabwe had improved the investment climate since the formation of a government by President Robert Mugabe and his rival Morgan Tsvangirai in February.
The new power-sharing government in Zimbabwe, which has the world's second-biggest platinum reserves after South Africa and large deposits of diamonds, coal and nickel, is keen to attract foreign mining companies to invest into a sector shunned due to fears that businesses could be expropriated.
Wednesday, September 16, 2009
Heavy Equipment for Sale: Report Shows Long Term Benefits of Gold Mining to Developing Economies
Heavy Equipment for Sale: Large-scale gold production has been found to be a major factor in bolstering the economies of developing countries, according to a key report issued today by the World Gold Council (WGC) in partnership with the International Council on Mining & Metals (ICMM) and Oxford Policy Management.MSloane Consulting is ready to supply heavy equipment for sale for gold mining operations.
The new report, ‘The Golden Building Block: gold mining and the transformation of developing economies’, authored by Maureen Upton, Sustainability Advisor to World Gold Council, considers the macroeconomic benefits of gold production in developing countries. The report takes into account the well-debated resource curse theories, and examines evidence of actual contributions through an in-depth case study of Tanzania and the effects of gold mining on its economy over a 40-year period.
The report also reviews case studies undertaken within the ICMM’s Resource Endowment initiative, analysing the costs and benefits of mineral extraction in Chile, Ghana, Peru and Tanzania. The final section seeks to provide observations on policy approaches and conditions likely to positively impact the economic contribution of gold mining more generally across other developing countries.
Monday, September 14, 2009
Mining Equipment: EurOmax commences diamond drilling at Ceovishte project, Serbia
Mining Equipment: EurOmax Resources Limited announce that it has commenced a 13 square kilometre geophysical program and a 2,500 metre diamond drilling program at Ceovishte to test two large gold bearing breccia bodies. During 2008 EurOmax completed a detailed mapping and soil geochemistry program defining a 6 kilometer long zone of strongly altered andesite volcanics and intrusives with abundant ancient mine workings. Drilling at the northern end of this trend by EurOmax in 2008 intersected multiple gossan and massive sulphide intervals, one of which reported 12.4 metres at 1.5% copper, 1.4% lead, 0.8% zinc, 62 g/t silver and 1.6 g/t gold. This program also defined a 3 kilometre by 2 kilometre magmatic complex at the southern end of the trend which remained undrilled in 2008. This feature is now the focus of the 2009 exploration program.
Friday, September 11, 2009
Used Mining Equipment for Sale: Caterpillar, Detroit and Mitsubishi Generator Sets

Used Mining Equipment for Sale:
Contact us msloane@msloaneconsulting.com for more information. Thank you.
(15) Generator Sets
(1) High Voltage Switch Gear
(3) Transformers
(2) Chillers
==========================================
1) Caterpillar SR4 313KVA Generator
==========================================
* Hours: 1177
* Rating of 313kva, 250 kw, cosO 0.8 standby 60 hz, 3 phase
* 10 wires, WYE connected, series connection
* 480 volts, 376 amp., excitation 35 volts, 7.1 amp.
* rev. 1800/min.
* temp. rise 130 degree C
* Engine: Model No. 3306-B D1
* Fuel: Diesel
==========================================
2) Caterpillar SR4 400KVA Generator
==========================================
* 400 KVA (370 KW) rated capacity
* 3 phase
* Powered by 6 cylinder CAT V-type engine
* Fuel: Diesel
==========================================
3) Caterpillar SR4 438KVA Generator
==========================================
* Hours: 1936
* Model: SR - 4
* 438 kva
* 350 kw
* cosO 0.8 standby 60 hz
* 3 phase
* 10 wires, Y connected, series connection
* 480 volts, 526 amp.
* excitation 37 volts, 7.7 amp.
* frame 450 rev. 1800/min.
* temp. rise 130 degree C
* Engine: Model 3406-B D1
* Fuel: Diesel
==========================================
4) Caterpillar SR4 462KVA Generator
==========================================
* 400 KVA (370 KW) rated capacity
* 3 phase
* Powered by 6 cylinder CAT V-type engine
* Fuel: Diesel
==========================================
5) Caterpillar SR4 1000KVA Generator
==========================================
* Model: SR - 4
* Rating of 1000 kva/800 kw, 0.8 p.f
* standby of 3 phase
* 10 wires, WYE connected, parallel connection
* 240 volts, 2406 amp.
* excitation of 28 volts
* 8.1 amp.
* 681 frame
* 1800 rpm
* 130 degree C max temp. rise
* Dimensions of 2,400 mm (H)
* Engine: Model No. 3508 Series
* Fuel: Diesel
==========================================
6) Detroit Diesel 375KVA Generator
==========================================
* 375 KVA, 300 KW Y 480/240 Volt
* 3-Phase 60 Hz
* 1800 RPM
==========================================
7) 2x Detroit Diesel 1000KVA Generator
==========================================
* Hours: 8053
* 1000 KVA, 800 KW Y 380V/220V, 1620 Amp
* 3-Phase 60 Hz.
* 1800 RPM
==========================================
8) Detroit Diesel 1625KVA Generator
==========================================
* Hours: 1598
* 1625 KVA, 1200 KW, Y 380V/220V, 2469 Amp.,3-Phase 60 Hz., 1800 RPM
* Fuel: Diesel
* With Cooling Tower
==========================================
9) Detroit Diesel 1625KVA Generator
==========================================
* Hours: 1164
* 1625 KVA, 1300 KW
* 80% PF
* Y 380/240V, 2469 Amp
* 3-Phase 60 Hz.
* 1800 RPM
* Fuel: Diesel
* With Cooling Tower
==========================================
10) 1988 Mitsubishi Seg825 750KVA Generator
==========================================
*Hours: 2406
*Model: SEG825, 750KVA, 3 Phase, 440/254 Volts, 1023/923 Amps
*4 Poles, 1800 RPM, 60 Hz, 0.8. PF
*95/90 excitation volts, 88/82 field amps
*40 degrees C coolant temp., F insulation
*40 V Brushless excitation, 35 V exciter
*11/10 field amp
* Engine: Model Seg825
* Fuel: Diesel
==========================================
11) 1989 Mitsubishi Seg1040 - 1040KVASynchronous Generator
==========================================
* Hours: 1867
* Seg 1040 model
* 3 phase, NTAKL type
* 1040 kva/938 kva output
* 460/265 volts
* 1305/1177 amp.
* 4 poles, 1800 rpm, 60 hz, 0.8 p.f, 35 V/35 V excitation
volts,
* 325 A / 300 A field amp.
* 40 degree C coolant temp.
* F insulation class
* 40 V brushless excitation
* 135 A/12.3 A field amp.
* 35 exciter volt
* Dimensions of 4,670 mm (L) x 2,500 mm (H) x 1,830 mm (W)
* Engine: Model S12A-PTA
* Fuel: Diesel
==========================================
12) 3x Mitsubishi MGS1500 1890KVA Generator
==========================================
* 1890 KVA / 1512 KW
* Continuous 1836 KVA / 1469 KW 60 Hz
* 480/227 Volts
* 2273 Amp
* Fuel: Diesel
==========================================
13) High Voltage Switch Gear
==========================================
* Incoming 34.5 KV, 3 phase, 3 wire, 60 HZ
==========================================
14) 3x Transformers
==========================================
* Serial No.: 3269
* 560 KV, Voltage: HV
* 48"x40"x24"
* Serial No.: 0920
* 250 KVA, Voltage: HV 440
* 48"x31"x22"
* Serial No.: 9404
* 200 KVA, Voltage: HV
* 40"x39"x39"
==========================================
15) 2x Chillers
==========================================
Wednesday, September 9, 2009
Mining Equipment for Sale: Three (3) Units of Caterpillar 988H Loaders
Heavy Equipment for Sale: Complete Used Telsmith Rock Crushing and Wet Screening Plant


COMPLETE USED TELSMITH ROCK CRUSHING and WET SCREENING PLANT - $268,060 USD +VAT
- Negotiable
- FOB Cebu, Philippines
1x Telsmith Model 36" x 14" Vibrating Grizzly
1x 2005 Telsmith Model 20" x 36" Roller Bearing Jaw Crusher
- With V-belt drive
- Manganese Jaw dies
- Hand hydraulic adjustnents for changing crusher setting
- Wedge lock mechanism controls for locking and unlocking grease lube system
- 100 HP motor and magnetic reduced voltage auto-transformer starter for 3/60/440 volts.
1x Telsmith Model 48S Gyrasphere Cone Crusher
- With fabricated steel main frame
- Cast upper frame seat
- Built-in receiving hopper
- Cast manganese steel concave ring and mantle
- Bronze inner and outer sleevs for eccentricity
- V-belt drive
- Heavy duty springs
- Water to oil cooling system
- 150 HP motor with base and magnetic reduced voltage auto-transformer starter for 3/60/440 volts.
1x Telsmith Model 24" x 24' Single Screw Classifier
- With motor and starter for 3/60/440 volts
1x set Telsmith model 6' x 16' Four deck Inclined Vibrating Screen
- With live frame
- Removable back plates
- Steel springs and pedestal supports
- Wire cloths
- Compact vibrator mounted with self-aligning spherical bearings
- Automatically adjusted counterweights
- Fixed speed V-belt drive
- Motor support
- 30 HP, 1800 RPM, TEFC, high torque motor with adjustable slide base
- 3/60/220/440 volts and push button starter
- Spray pipe assembly included
Other Components:
- Structural steel supports for the Vibrating Feeder, Vibrating Screen, Jaw Crusher, Gyrasphere Crusher and Single Screw Classifier
- Rock box type structural steel hopper, chutes, feedboxes, platforms and ladder
- Feed, return and (4) product conveyors complete with motors and starters
- Motor control centers complete with panel board with wirings and cables
Comments:
This plant was intermittently used for only about (2) years and is still in very good condition.Thursday, August 20, 2009
Used Construction Equipment for Sale: France's Eco-Motorway
Used Construction Equipment for Sale: France's first eco-motorway and biggest road infrastructure project to date has been finished following 4 million man hours put in by more than 8000 workers.Wednesday, August 19, 2009
Heavy Equipment for Sale: San Bernardo project located in the Alamos Mining district of Sonora, Mexico
Heavy Equipment for Sale: A spokesperson announced that following the successful identification of several significant anomalous zones on Canadian Mining’s San Bernardo project located in the Alamos Mining district of Sonora, Mexico the Company is now negotiating to initiate the drill exploration program as recommended by SJ Geophysics’ June 2009 report. The details and terms will be announced when finalized. According to MSloane Consulting, it is ready to supply heavy equipment for sale for its copper mining operations. In other news, Canadian Mining’s US subsidiary (Canadian Mining of Arizona Inc.) completed a NI 43-101 report on the Company’s 4000 acre Bullard Pass gold project. The report identified 3 large anomalous areas. The Company’s US qualified person Dr. Pat O’Hara has recommended a 5000′ drill program to determine the depth of mineralization. Canadian Mining aims to discover large tonnage gold deposits along upper plate structures or at intersections between these structures using the detachment fault mineralization model. Dr. O’Hara will begin the permitting and bidding process for the drill program in September 2009.
Tuesday, August 18, 2009
Construction Equipment: Komatsu WB156-5 and the WB156PS-5
Construction Equipment: Komatsu America Corp.’s WB156-5 and the WB156PS-5 are equipped with Tier II engines and feature operating weights between 16,530 and 18,780 lbs. (7,498 and 8,518 kg) and loader bucket options up to 1.50 cu. yd. (1.1 cu m). These models are the big brothers of the WB146-5 and WB146PS-5.MSloane Consulting provides construction equipment for sale for various construction companies worldwide.
The loaders feature a spacious operator station to provide maximum comfort for any size operator. They are available in either open ROPS canopy or enclosed dual entry cab, which allows for easy access from either side of the machine. The climate-controlled cab has 10 vents for maximum air circulation and its curved shape and large windows provide the operator with 360 degree visibility. A one piece, floor-to-ceiling rear-opening window provides outstanding backhoe visibility.
Monday, August 17, 2009
Mining Equipment: Topia Silver-Zinc Mine
Mining Equipment: The Topia silver-zinc mine is situated in the west-central Durango State of Mexico. The area covers four blocks of mineral exploitation concessions over 6,344ha. Minera Mexicana EI Rosario, a subsidiary of Great Panther, owns 100% of the concessions.MSloane Consulting provides mining equipment for various mining companies worldwide.
The Recompensa vein was reopened in January 2009 under new mining contracts. It contributed to first quarter results when high records were set for silver and ore grade.
The Topia mine targets clean mining of high-grade narrow veins with reuse mining. The exploratory development is limited to known areas where there is strong potential for wider and higher grade veins.
The Topia mining district is among the oldest in Mexico. Most of the mine’s veins lie on the Great Panther property.
Friday, August 14, 2009
Used Mining Equipment for Sale: Twangiza Banro Gold Project
Used Mining Equipment for Sale: Banro Corporation announce that it has entered into an agreement to purchase a refurbished gold processing plant capable of achieving a throughput capacity of 1.3 million tonnes per annum. MSloane Consulting provides heavy equipment for sale for various construction and mining companies worldwide.The closing of the purchase of the plant is expected to occur on or about September 21, 2009. This acquisition supports the Company’s strategy of advancing production through a staged approach which will focus initially on the processing of oxide material at the Company’s wholly-owned Twangiza gold project in the Democratic Republic of the Congo (the “DRC”).
It is planned that the plant will be transported by sea from Australia, via the Mombasa port in Kenya, and then by road to the Twangiza project site in the DRC, where it will be erected and commissioned over the next 24 months. The Company intends to further optimize this timeline as the project moves forward.
Thursday, August 13, 2009
Used Construction Equipment for Sale: Tornado Tower, Doha, Qatar
Used Construction Equipment for Sale: This striking tower that allows for interesting exterior lighting is located in Doha, Qatar. MSloane Consulting, it is ready to supply used construction equipment for sale for any construction projects around the world.Architects CICO Consulting Architects and Engineers / SIAT Architekten + Ingenieure Munchen GmbH built a lightweight structure that allows for flexible floor plans and efficiencies in construction, economics and energy.
For Sale: Foremost MPD 1500 Tracked Tiltable Platform Reverse Circulation Rig
Foremost MPD 1500 Tracked Tiltable Platform Reverse Circulation Rig - Located in Nevada, U.S.A
- With 90,000 lb pullback.
- 10,000 hrs but has completely overhauled in 2006 and has been in dry storage since.
- Comes with a very comprehensive spares package including many engine, compressor, new drill bits and 2 new hammers etc.
- Top head was over hauled and all new seals ready to go to work.
- Comes with very good condition low loader with removable goose neck, also with spares, wheel tyres, hydraulic pipes, etc.
- Also included is 900 ft of double walled drill pipe.
- As is, where is.
Wednesday, August 12, 2009
Heavy Equipment for Sale: Antapaccay and La Bambas Copper Project
Heavy Equipment for Sale: Production at the Antapaccay copper project in Peru is set to start by the end of 2012 or the beginning of 2013, while Las Bambas should be operational by the close of 2014 according to mining giant Xstrata. According to MSloane Consulting, it is ready to supply heavy equipment for sale for its copper mining operations.Annual copper output from Peru will increase to 500 000 tonnes by 2014, not including contributions from Antamina, Xstrata announced.
The bulk of its projected production would come from Las Bambas, which Xstrata recently said has a mineral resource of 1,13-billion tons with a copper grade of 0,77%.
The new estimate, published earlier this month, represents a 26% jump from the company's last forecast.
The Antapaccay project has resources of 720-million tons with a copper grade of 0,56%, the company said, which is a 38% increase from its previous estimate.
Feasibility studies on both projects are expected by the end of this year.
Tuesday, August 11, 2009
Construction Equipment: The Broadgate Tower, London, UK
Construction Equipment: Architects Skidmore, Owings and Merrill were praised for the efficiency of the design of the The Broadgate Tower for the creation of a pedestrian pass through the building, which in turn connects the structure to the surrounding environment.
Monday, August 10, 2009
Mining Equipment: The Kermadec SMS deposits in New Zealand
Mining Equipment: One of the key seafloor massive sulphide (SMS) projects of Neptune Minerals, is Kermadec, based in the northern waters of New Zealand. MSloane Consulting provides mining equipment for mineral explorers and developers, while Neptune Minerals is into exploring and developing precious and base metal SMS deposits. SMS is a high grade hydrothermal deposit containing high levels of copper, zinc and lead along with high gold and silver content.
Neptune Minerals has been granted exploration licences for an aggregate of 261,146km² in the territorial waters of New Zealand and Papua New Guinea. It also has licences in the Federated States of Micronesia and Vanuatu.
Neptune, along with Canyon Offshore, Century Subsea and Seacore, undertook coring and sea-floor mapping in the company’s granted prospecting licence (Kermadec PL 39-195), within New Zealand’s 200 nautical mile Exclusive Economic Zone.
Friday, August 7, 2009
Used Mining Equipment for Sale: Russian Technologies to Make $3-billion Investment in their Untapped Copper Field
Used Mining Equipment for Sale: Russian Technologies, a state-owned conglomerate, and its partners are planning to invest $3-billion for used mining equipment for sale and other operation requirements to develop Russia's largest untapped copper field in the next two to three years and are seeking loans from state and foreign banks.MSloane Consulting provides heavy equipment for sale for various construction and mining companies worldwide.
Head of Russian Technologies, Sergei Chemezov, said on Thursday that the partners in the Udokan copper project were in talks with state-owned banks VEB and VTB and did not rule out borrowing from foreign banks to develop the Siberian copper field.
"I think we will be finished in two to three years," Chemezov told reporters in the Turkish capital, Ankara, during a visit by Russian Prime Minister Vladimir Putin.
He said the partners in Udokan, including iron and steel firm Metalloinvest, would finance some of the investment in construction, preparation and exploration at Udokan, located in the Zabaikalsky region of Siberia.
Thursday, August 6, 2009
Used Mining Equipment for Sale: Linked Hybrid, Beijing, China
Used Mining Equipment for Sale: This 220,000 sq m project features 750 apartments, green space, commercial zones, entertainment and education facilities. But what makes it really special is how architect Steven Holl has managed to achieve a porous flow through the building with linked walkways, multifaceted layers and open passages. Its use of colour is admirable and adds to the buzzing feeling of this development.
Tuesday, August 4, 2009
Construction Equipment: Manitoba Hydro Place
Construction Equipment: Manitoba Hydro Place in Winnipeg, Canada is 115m tall by Kuwabara Payne McKenna Blumberg Architects/Smith Carter Architects and Engineers. It was recognised for being completely site specific as data on wind, sun and temperature at the site was analysed to produce a sustainable tower that uses 60% less energy than a regular office block.
Monday, August 3, 2009
Mining Equipment: One Billion Ton Iron-ore Resource in Liberia
Mining Equipment: TSX Venture Exchange- and Aim-listed Mano River on Monday announced an initial independent mineral resource estimate of 1,08-billion tons of iron-ore at its 38,5%-owned project in Liberia.Russian steelmaker Severstal’s mining subsidiary owns the majority stake of 61,5% in the Putu Range project, in which it had invested $30-million.
The Putu resource had potential to grow as its exploration programme advanced, Mano president and CEO Luis da Silva reported.



