Friday, February 26, 2010
Used Mining Equipment for Sale: 2005/2006 Moxy MT41 Articulated Dump Trucks for Sale
- Price: $137,000 USD ea ex-works or best offer plus 6% Buyers fee. Plus GST charges for Australian Buyers
- Hours: 3,507 to 4,536
- Weight: 14 Tons
- Location: Australia
Features:
- Air Conditioner
- Bed, Standard
- Auto Lube
- Retarder
- Tailgate
Contact us for more information.
Thursday, February 25, 2010
Used Construction Equipment: Meridian Systems' Proliance Software to be Used in Construction Management by Weston Solutions
With more than 60 offices around the globe, WESTON, ranked 35 on the ENR top 200 environmental firms and 65 on the ENR top 500 design firms, is a global leader in environmental solutions, sustainable development, design/build construction, green buildings, and clean energy.
Wednesday, February 24, 2010
Heavy Equipment for Sale: Sulzer, Wartsila and Pielstick Diesel Engines with Generators for Sale
225MW Power Plant with 21 Sulzer 16ZAV40S HFO Diesel Engines
- Units: Sulzer 16ZAV40S Engine x 21
- Call for price (negotiable)
- Hours: 40,000 approx
- Location: Luzon, Philippines
- Fuel: Diesel Bunker "C" Fuel
- With original spare parts
The plant, with an initial contracted capacity of 215 MW which was increased to 225 MW beginning January 1997, generates power using twenty-one (21) Sulzer ZAV40S diesel engines with Alstom Generators operating synchronously. The diesel engines were manufactured and supplied by New Sulzer Diesel of France.
With ISO 14001:2004 Certification from Certification International.
This plant is for immediate sale.
90MW Power Plant with 5 Pielstick 18PC4 HFO Diesel Engines
- Units: 18MW Pielstick 18PC4 Engine x 5
- Price: $708, 000 each (as is, without overhaul or Hz conversion)
- FOB Plant
- Location: Philippines
Units need to be overhauled as they have been idle. Cost for overhaul: Minimum $86,950 USD to maximum of $260,898 (per engine depending on condition of engines when taken down).
Cost for overhauled engines turned back to zero hours, 60Hz: Minimum $794,956 USD to maximum $968,898 USD per engine.
Can be converted to 50Hz but will reduce power output by 17%-20%. Cost for overhauled engines turned back to zero hours with 50Hz conversion is minimum $849,956 USD to maximum $1,023,898 USD per engine.
We can provide overhauling done by ISO certified companies. We can also help in transport quote and recommissioning of plant.
3.3MW Power Plant with Wartsila Vasa 9R32 HFO Diesel Engine and Auxiliaries with Complete Manuals and Special Tools
- Price: $426, 000 USD or best offer
- FOB site
- Location: Philippines
The engine was manufactured in 1989 and all preventive maintenance for the engines and auxiliaries were all done by Wartsila Philippines. The engine is very well maintained and parts are all original Wartsila and recently underwent 80,000H PMS, wherein the engine had been practically placed to ZERO HOUR. This is one of the best small plants operated in the Philippines considering that it was previously owned by Unilever, a multinational company.
Please feel free to contact us for your inquiries. Thank you.
Tuesday, February 23, 2010
Construction Equipment: Deere Reports 19% Rise in Earnings for Farm Equipment as Construction Units Remain Sluggish
Monday, February 22, 2010
Mining Equipment: Major South African Gold Mining company Harmonyto Produce 100,000 Oz over the Next 12 Months
Friday, February 19, 2010
Used Mining Equipment for Sale: Alix Resources to Mine Rare Earth Oxides
MSloane Consulting provides used mining equipment for sale to mining projects worldwide.
Thursday, February 18, 2010
Used Construction Equipment: Federal Stimulus Stimulates Construction
Ken Simonson, chief economist of AGC said that Obama's stimulus package is one of the very few life savers that the construction industry experienced last year and is one of the few hopes to keep it going in 2010.
See one of our used construction equipment for sale.
Wednesday, February 17, 2010
Heavy Equipment for Sale: 225MW, 90MW and 3.3MW HFO Power Plants for Sale in the Philippines
225MW Power Plant with 21 Sulzer 16ZAV40S HFO Engines
- Call for price (negotiable)
- Hours: 40,000 approx
- Location: Luzon, Philippines
- Fuel: Diesel Bunker "C" Fuel
- With original spare parts
90MW HFO Power Plant with Five (5) 18PC4 Pielstick Engines
- Units: 18MW 18PC4 Pielstick Engines x 5
- Price: $708, 000 each (without overhaul or Hz conversion)
- FOB Plant
- Location: Philippines
3.3MW Wartsila Vasa 9R32 HFO Engine and Auxiliaries with Complete Manuals and Special Tools
- Price: $426, 000 USD or best offer
- FOB site
- Location: Philippines
Contact us for inquiries.
Thank you.
Tuesday, February 16, 2010
Construction Equipment: Construction in Wales performed better than the rest of the UK
The data, compiled by the Royal Institution of Chartered Surveyors, found the sector in Wales did better than every other UK region and nation.
Rics’ survey found that all other regions reported a decrease in workloads in Q4, with 12% more chartered surveyors reporting a decline compared to a rise.
However, Wales saw 20% more chartered surveyors reporting a rise in workload compared to a fall.
Looking forward, overall expectations for workloads, employment and profits for the next 12 months are all fairly downbeat.
Workload expectations for future activity deteriorate with an equal number of surveyors expecting a rise or a fall – this compares drastically to Q3 when 50% of chartered surveyors anticipated an increase than a decrease in workloads.
Monday, February 15, 2010
Mining Equipment / Power Generation Equipment: 225MW, 90MW and 3.3MW HFO Power Plants for Liquidation in the Philippines
- Call for price (negotiable)
- Hours: 40,000 approx
- Location: Luzon, Philippines
- Fuel: Diesel Bunker "C" Fuel
- With original spare parts
90MW HFO Power Plant with Five (5) 18PC4 Pielstick Engines
- Units: 18MW 18PC4 Pielstick Engines x 5
- Price: $708, 000 each (without overhaul or Hz conversion)
- FOB Plant
- Location: Philippines
3.3MW Wartsila Vasa 9R32 HFO Engine and Auxiliaries with Complete Manuals and Special Tools
- Price: $426, 000 USD or best offer
- FOB site
- Location: Philippines
Contact us for inquiries.
Thank you.
Friday, February 12, 2010
Used Mining Equipment for Sale: Mindoro Resources Targets 50 to 70 Million Dry Metric Tonnes of Nickel and Iron Ore
This is in addition to Mindoro's Agata North Project, which has an indicated and measured resource of 26.92 million DMT at 1.11% nickel and 0.06% cobalt, containing 657 million pounds of nickel and 24 million pounds of cobalt, and an additional 3.79 million DMT in the inferred category, containing 89 million pounds of nickel and 2 million pounds of cobalt.
The Surigao projects are in an important nickel producing district. The Agata North project contains major strategic nickel laterite resources with strong competitive advantages, including excellent infrastructure, close proximity to the ocean and markets, abundant limestone on site and potential for establishment of a world-class nickel and cobalt processing operation.
Thursday, February 11, 2010
Used Construction Equipment: Construction for London 2012 Olympics on Schedule
Wednesday, February 10, 2010
Heavy Equipment for Sale: Formation Metals will Develop, Operate and Reclaim the Idaho Cobalt Mine
The mine will begin production in early 2011. When operational, the mine will annually produce 1,525t of high purity and super-alloy-grade cobalt. Production will equal 3.3% of global cobalt supply.
Tuesday, February 9, 2010
Power Generation Equipment - for Sale: 3.3 MW Wartsila Vasa 9R32 Engine and Auxiliaries with Complete Manuals and Special Tools
Price: Call us
Location: Philippines
The engine was manufactured in 1989 and all preventive maintenance for the engines and auxiliaries were all done by Wartsila Philippines. The engine is very well maintained and parts are all original Wartsila and recently underwent 80,000H PMS, wherein the engine had been practically placed to ZERO HOUR. This is one of the best small plants operated in the Philippines considering that it was previously owned by Unilever, a multinational company.
Below is the specs of the engine and generator. This is a complete plant with ABB Brushless Synchronous 4000KVA 720 RPM alternator, ABB Stromberg Control Panel, Main Distribution panel with Siemens instrumentation, 3 Wesfalia separators type 5-02-066/4 and 20-02-066/4, water softening system, compressed air system, 3 units of 7 MT Day tanks and water cooling system, complete manuals and set of special tools.
Monday, February 8, 2010
Mining Equipment: Nebu Resources Inc. Continues Drilling on its Denton Township Projects
The vein or veins appear to have been intersected in all of the recently completed drill holes with the highlights from recent assay data including the results from drill hole DE-09-26 that include core length intervals of 1.5 metres assaying 1.85 g/t and 2.6 metres averaging 3.03 g/t in the vein zone and a deeper intersection averaging 17.18 g/t over a core length of 3.2metres near the contact of the diorite intrusion.
While the latter intersection is deeper, it should be noted that this intersection is still less than 120 metres below surface, whereas much of Lakeshore Gold’s recent success has resulted from drilling holes to depths of more than 700 metres vertically.
Friday, February 5, 2010
Used Mining Equipment for Sale:
The three properties, Central Catharine, Link-Catharine, and the 80-Foot-Fall property are located within the Boston-Skead gold belt of northeastern Ontario. This crescent-shaped gold belt is 25 km south of the still productive Kirkland Lake gold belt that has yielded 24 million ounces of gold in the past century of mining. Gold mineralization in this belt occurs with quartz, quartz-sulphide veins and veinlets in Archean volcanic rocks that have been intruded by granitic batholiths.
For the Link-Catharine area lying centrally between the other two properties, the most recent exploration work within the package of properties was conducted in 2008 and 2009. Highlights include 3.55g/t gold over 3 m and 3.26 g/t gold over 1.2 m in hole DDH CAT 08-22, and 1.01g/t gold over 10 m and 2.65 g/t gold over 3.4 m in DDH CAT 08-04, and 17.5g/t gold over 1 m in DDH CAT 09-02. Together with values of 6.00g/t over 8.6 m and 1.91g/t gold over 20.4 m from hole 99-4, and encouraging gold values from numerous other holes within a broad target area, the results suggest an extensive zone of gold mineralization that warrants concerted continued evaluation for gold deposits.
Thursday, February 4, 2010
Used Construction Equipment: JCB and Volvo Join Forces for Skid Steer Loaders
It is envisaged that the first mono boom Volvo branded machines will be in production at JCB’s Savannah, Georgia facility by year end 2010. Volvo Construction Equipment will then transition skid steer loader models over time from its Pederneiras facility in Brazil.
Wednesday, February 3, 2010
Heavy Equipment for Sale: Philex Ships P805-M Worth of Metals in January
In a disclosure to the Philippine Stock Exchange, Philex president Jose Ernesto Villaluna Jr. said Philex delivered 684,459 dry metric tons of ore resulting in 4,705 DMT of concentrates.
The concentrates contained 55.17 grams per DMT of gold, 24.96% copper and 57.09 grams per DMT of silver or about 8,354 ounces of gold, 2.59 million pounds of copper, and 8,636 ounces of silver.
In January last year, Philex produced 752,261 DMT of ore resulting in 6,122 DMT of copper concentrates averaging 61.6 grams per DMT of gold, 23.81% copper, and 60.03 grams per DMT of silver or about 12,134 ounces of gold, 3.21 million pounds of copper, and 11,817 ounces of silver.
Tuesday, February 2, 2010
Construction Equipment for the Hong Kong-Zhuhai-Macau Crossing
The project has been on the drawing board for some time after first being discussed by politicians in the 1980s. The Hong Kong-Zhuhai-Macau Bridge Advance Work Coordination Group was established in 2003 and the China’s Central Government and the regional governments of Guangdong, Hong Kong and Macau agreed finance last summer.
Monday, February 1, 2010
Mining Equipment: Voorspoed Mine Continues Diamond Production
The mine is expected to have a full capacity production of 800,000 carats per year. The company ramped up production levels from 60,000 carats in October 2008. Over ten million carats are expected to be generated during the life of the mine.